OPERATING AND INSTALLATION INSTRUCTIONS LBE 250 / LBE 500
PAGE 6
3. Safety Instructions
General information
The following safety symbols indicate
text passages that warn against risks
and sources of danger. Please familiari-
se yourself with these symbols.
The non-observance of this
warning can lead to injury or
danger to life and limb and/or
damage of the device.
Dangerous electrical voltage!
The non-observance of this
warning can lead to injury or
danger to life and limb.
General safety notices
All safety and danger notices located
on the device must be observed. In case
of malfunctions, shut down the device
immediately and secure it against acti-
vation. Malfunctions must be eliminated
immediately.
After servicing work, have expert per-
sonnel re- establish the operating safety
of the device. Use only original spare
parts. For the operation of the device,
the national regulations also apply wit-
hout limitation.
READ THESE OPERATING
INSTRUCTIONS CAREFULLY
AND FOLLOW THE SAFETY
NOTICES.
Damage arising from a non-observance
of the operating and maintenance inst-
ructions is not covered by the guarantee.
This device is not intended to be used by
people (including children) with limited
physical, sensory, or mental capabili-
ties or with a lack of experience and/
or knowledge, unless supervised by
a person who is responsible for their
safety or who instructs them in the use
of the device. Make sure that children do
not play with the device.
After commissioning, the
current supply may not be
interrupted for longer than one
day so that the hygienic requirements
can be observed.
In case of an interruption in the elec-
trical voltage supply of more than 24
hours, the air humidification unit may
become contaminated with germs. In
this case, a general cleaning (a cleaning
agent on an organic basis) of all com-
ponents should be performed before
the unit is commissioned. If necessary,
components must be replaced.
Deactivation of the ventilation and air
conditioning system
If the ventilation and air conditioning
system is decommissioned for more
than one day, the air humidification
unit must be shut down beforehand for
at least two hours. In this way, the air
humidification unit can thus dry out and
hygienically perfect function is guaran-
teed.
Working on the device
Mounting, commissioning,
maintenance, and repairs must
be performed by an authorized expert
(heating specialist firm/installation
specialist firm).
When working on the device,
de- energise it and secure it
against reactivation. The water
supply must be shut off.
UVC disinfection pipes
A UVC pipe ( Art.No. 40I0023A)
is installed into the standard
version of the device! It may only be
replaced by a type listed on the label of
the device. UVC pipes may be changed
only by authorised expert personnel! Be-
fore the unit is opened or a UVC pipe is
changed, the device absolutely must be
de-energised and the mains plug must
be pulled. Never look directly into the lit
UVC light source without eye protection.
S
PE
CI
A
LI
S
T PER
S
O
NNEL
G
ENER
A
L
US
ER