OPERATING AND INSTALLATION INSTRUCTIONS LBE 250 / LBE 500
PAGE 9
5. Structure
1
2
3
4
5
6
7
8
9
10
11
12
S
PE
CI
A
LI
S
T PER
S
O
NNEL
G
ENER
A
L
US
ER
1 Water tank
2 Motor
3 UVC pipe for disinfection
4 Sensor plate with a temperature and
humidity sensor
5 Inlet valve
6 UVC pipe series connection unit
7 Reverse osmosis membrane
(LBE 250, 1 pc / LBE 500, 2 pcs)
8 Outlet pump
9 Electronic operation system
10 Main board
11 Bladed rotary evaporator
12 Warm water heater battery (air side)
Care has to be taken that the packing
material and the protective packing
are disposed of in an environmentally
friendly way. The packing materials have
to be disposed of in accordance with the
local stipulations, for example, wooden
pallets and cardboard packing have to
be recycled.
Care has to be taken that the
packing material and the pro-
tective packing are disposed of
in an environmentally friendly
way. The packing materials have to
be disposed of in accordance with the
local stipulations, for example, wooden
pallets and cardboard packing have to
be recycled.
4.6 WASTE DISPOSAL