OPERATING AND INSTALLATION INSTRUCTIONS LBE 250 / LBE 500
PAGE 43
1.
Switch off
the ventilation unit to prevent the gases of
the cleaning agent from entering the ventilated rooms.
2.
Switch off the air humidification unit with the ON/OFF
key and wait until the water tank is empty.
(pressed for
longer than 3 seconds,
see Chapter 8.1, Page 13
)
Rotor,
ultraviolet lamp, etc. are active!
The device is still connected to the voltage supply.
In the display, “manu Standby” is shown
(see Chapter 9.3, Page 15)
In this operational status, the air humidification unit
remains switched off. The water is drained and the UVC
pipe and the rotor are switched off with a delay of 20
minutes..
3. Start the “Expert menu”.
By this, the components
(rotor, UV lamp, etc.) are automatically switched off.
The device is still connected to the voltage supply.
4.
Remove the two
screws (1)
in the centre of the device
cover and remove the
cover (2)
. Fold forward the
housing front with the
display (3)
.
Sharp edges of plate (danger of injury).
5.
Cover electronic components using plastic foil in order
to protect them
against humidity in the following
worksteps.
Make sure that no water drips on the electronic
components.
6. Remove the
rotor cover (4)
.
Grab the rotor only when wearing gloves since the
blades have sharp edges (danger of in
jury)
US
ER
G
ENER
A
L
S
PE
CI
A
LI
S
T PER
S
O
NNEL
manu STANDBY
Expert
<
Code?
------
Schrauben Deckel
1
2
3
Screws / Cover
4