LIFEPAK 20/20e Defibrillator/Monitor
Replacement Procedures
Front Case
(continued)
A05 User Interface (UI)
PCB Installation
(continued)
3. Place the two grounding harnesses (221) onto the new lower left and right
4-40
0.312 screws (173); torque to 6.8 in-lb.
4. Install four new 4-40
0.312 screws (173) onto the A05 UI PCB; torque to
6.8 in-lb. Refer to
for grounding harness
placement.
Note:
Replace any broken or frayed grounding straps.
5. Install the Speed Dial connector to the A05 UI PCB at J32.
6. Connect the W18 UI Flex Cable to the A05 UI PCB at J31.
7. Complete the process by
assembly.
9-54