![Panduit Smartzone PViQ Connectivity System Скачать руководство пользователя страница 93](http://html1.mh-extra.com/html/panduit/smartzone-pviq-connectivity-system/smartzone-pviq-connectivity-system_user-manual_3458906093.webp)
PVIQ™ CONNECTIVITY SYSTEM USER MANUAL V 1.0
92
8. You may continue remove additional interconnect patch cords from the panel that
are in Learn mode.
9. Upon completion of all your removals, change all panels in Learn mode back to
secure mode. For each panel in Learn mode, select
Secure
in the
Configuration Mode
field from the pulldown menu.
NOTE: You may have to log back into each system to change the panels back to
Secure Mode, because the web UI will automatically log you out after five minutes of
inactivity.
10. Click on the
Save
button to change the panel into Secure mode.
a. The Mode LED on the panel will extinguish.
11. Repeat steps 9 and 10 for each panel in Learn mode.
12. The removed connection(s) have been removed from the system(s), the panels
are in secure mode.
Adding a Fiber Interconnect to the Patch Field
An interconnect fiber patch cord is a fiber cable that connects PViQ™ Connectivity
System ports to network devices (i.e. Ethernet Switch, Server, etc.). There are two
methods to add fiber interconnect cables to the patch field. The first method is through
individual port security policy setting, and the second method is through panel Learn
mode. The following sections provide the steps to implement either method.
Individual Port Security Policy Method
This method may be used at initial patch field setup or when adding to a patch field that
is already set up. This method is typically used when adding connections to a patch field
that is already set up.
Perform the following steps to add fiber interconnect cables to a PViQ™ Connectivity
System patch field.
1. Connect the interconnect patch cord between the PViQ™ Connectivity System
port and the network device in the patch field.
a. A security alarm will alert from the PViQ™ Connectivity System panel that
the patch cord is plugged into.
b. The port LED above the ports that the patch cord is plugged into will light
red, indicating a security policy violation.
2. Open a supported web browser. Enter the IP address of the PViQ™ Connectivity