1-101
1
1
User inspection places
Serviceman inspection
places
• Filter and grill cleaning
• Exterior cleaning
• Check the operating status
• Clean the drain pan or things related to the water discharge
• Heat exchanger cleaning
1-17. CHECKS AFTER INSTALLATION HAVE COMPLETED
Check the following items after completing installation.
Is there a short circuit with the intake air
fl
ow?
Is the insulation secure? (Refrigerant piping)
Are there any errors with the wiring?
Are the terminal screws loose? Tightening torque (Unit: N•m {k
g
f•m})
M4… 1.57-1.96 {0.16-0.2}, M5... 1.96-2.45 {0.2-0.25}.
Is the drain water
fl
owing smoothly?
Is the insulation material properly installed?
Is the earth wire securely connected?
Is the front panel and the indoor unit air conditioner
fi
rmly
fi
xed and was the installation completed without any leakage
from the refrigerant?
Are the indoor and outdoor units secured
fi
rmly installed with bolts at secured locations?
1-18. REGARDING DELIVERY TO THE CUSTOMER
Request the customer to review the instruction manual and explain the operating method for the product.
In addition, it is also recommended that regular inspection checks are agreed upon for maintenance.
Refer to the installation instruction manual provided with the indoor unit for the specifi cations on
the indoor unit installation.
1. Dimensions of Air-Discharge Chamber
1
Unit: mm
Unit: mm
In snowy regions, if there is concern that snow may enter the air discharge chamber, remove the base of the chamber before
using.
Reference diagram
Air
discharge
Air Intake
Air Intake
Air Intake
Air
discharge
Air Intake
Air
discharge
980
612
(324.5)
43.5
1500
(
Reverse side 4
)
1
4
3
8
9
10
2
6
7
5
370
486
649
(163)
(116)
627
143
484
(166)
32
48
Upward,
Louver installation guide
Upward, Air-discharge support
Upward, side installation fixture
t0.8
2
7
2
1
1
1
1
6
1
1
12
Q’ty
t0.8
t0.8
t0.8
t0.8
t0.8
t0.8
t1.0
Upward,
Louver
1
1
1
4
Downward, Air-discharge support
5
5
5
5
5
5
Downward, Right side installation fixture
Downward, Left side installation fixture
Downward,
Louver
Downward, Upward installation fixture
Downward, Downward installation fixture
Tapping Screw (4mm x 12mm)
2
3
6
7
8
9
10
11
A
SEC A-A
SPOT WELDING 28 POSITION
A
585±0.2 (608.2)
585±0.2
(612)
39
(77)
47.5
64.7
78.2
46
9
(55°)
(25°)
P78.2×6=469.2
3
2
2
7
13
Reference diagram for Upward Air-discharge support (field supply)
1-19. Supplement
SM830252-01_欧州_Single_8・10HP_TD_SM.indb 101
16/10/14 13:58:15
AMP Air Conditioning
www.ampair.co.uk | [email protected]