INF-35
5. On main windows, select
“Project”
and then
“Project Settings”
as shown in the figure below.
6. Make sure that the
“Sequential Program”
has been set at the first line. (Do not set “Turbo Program”.)
Figure 9-2C-3
7. On main windows, select tab
“Options”
, and then select
“Cable and I/O Port Setup”
.
Figure 9-2C-4
Содержание AJ-YA120AG
Страница 3: ... 3 ...
Страница 4: ... 4 AJ HD1200AE ...
Страница 5: ... 5 ...
Страница 6: ... 6 AJ YA120AG AJ YAD120AG ...
Страница 8: ... 8 AJ HD1200AP ...
Страница 9: ... 9 ...
Страница 10: ... 10 AJ HD1200AE ...
Страница 11: ... 11 ...
Страница 12: ... 12 AJ YA120AG AJ YAD120AG ...
Страница 13: ...FCD0405NTKK67E494E495 ...
Страница 312: ...73 73 73 73 31 95 89 MECHANICAL CHASSIS ASSEMBLY 1 MPL 1 ...
Страница 314: ...MECHANICAL CHASSIS ASSEMBLY 2 MPL 3 ...
Страница 316: ...58 59 57 36 59 59 E9 SUB CHASSIS ASSEMBLY MPL 5 37 55 38 39 55 55 57 55 55 ...
Страница 318: ...FRONT LOADING ASSEMBLY MPL 7 E22 112 109 104 109 104 ...
Страница 493: ...E1 2 1 2 3 10 4 5 6 9 1 E2 8 7 PACKING ASSEMBLY AJ YA120AG OPL 3 ...
Страница 495: ...E1 2 1 3 11 4 5 6 7 8 10 9 12 23 E2 24 25 26 26 21 22 27 27 OPL 5 PACKING JACK PANEL ASSEMBLY AJ YAD120AG ...
Страница 552: ...MECHANICAL CHASSIS ASSEMBLY 2 MPL 3 ...
Страница 554: ...58 59 57 36 59 59 E9 SUB CHASSIS ASSEMBLY MPL 5 37 55 38 39 55 55 57 55 55 ...
Страница 556: ...FRONT LOADING ASSEMBLY MPL 7 E22 112 109 104 109 104 ...
Страница 634: ...E1 2 1 2 3 10 4 5 6 9 1 E2 8 7 PACKING ASSEMBLY AJ YA120AG OPL 3 ...
Страница 636: ...E1 2 1 3 11 4 5 6 7 8 10 9 12 23 E2 24 25 26 26 21 22 27 27 OPL 5 PACKING JACK PANEL ASSEMBLY AJ YAD120AG ...