INF-7
4. MAINTENANCE
4-1. Maintenance Schedule
Maintenance is done by periodically performing suitable maintenance servicing in order to maintain the functions
always in best condition, so that the user can use the equipment safely. Video equipment with mounted
mechanisms wear parts, and their wear and deterioration cause problems. Dust and dirt also can impair stable
operation. For this reason it is important to not just perform repair at the time of a problem, but to perform suitable
maintenance at regular intervals.
Drum Rotation (hours)
Part name
Part No.
Every 1,000
3,000
6,000
9,000
12,000
- Cleaning tape transportation
-----
C: Every 500 hours
- Mechanical chassis unit
VXY1842Z1
R
1 Cylinder
Unit
VEG1655
R R R
IM
2 Pinch Arm Unit
VXL3040
R, G
R, G
R, G
R, G
IM
3 Cleaning Arm Unit
VXL3028
R: Every 1000 hours
IM
4 S Reel Motor Unit
VEM0724
R
IM
5 T Reel Motor Unit
VEM0731
R
IM
6 Capstan
Unit
VEM0717
R
IM
7 S Loading Unit
VXA7528
R,
G
IM
8 T Loading Unit
VXA7530
R,
G
IM
9 S4 Post Base Unit
VXA7523
R
IM
10 S Tension Arm Unit
VXL3165
R
IM
11 T5 Arm (1) Unit
VXL3164
R,
G
IM
12 T6 Arm Unit
VXL3163
R
IM
13 Mode SW Unit
VES0925
R
IM
14 A/C Head 1 Unit
VED0466
IM
15 Motor Unit
VEM0726
IM
16 Reel Drive Motor Unit
VEM0585C
IM
17 Pinch Solenoid
VSJ0227
IM
18 S Brake Solenoid
VSJ0216
IM
19 T Brake Solenoid
VSJ0216
IM
20 MIC SW Base Unit
VXA7921C
IM
21 Cleaner Solenoid
VSJ0226
IM
22 Main Cam Gear
VDG1424
IM
23 Reel Stopper Solenoid
VSJ0216
IM
24 Front Loading Motor U.
VXA5597
F
25 Front Loading Unit
VXA7920
R
26 Fan motor
L6FAHBBD0001
R
Exchange of the mechanical chassis unit is recommended for the 12,000 h maintenance.
C
: Perform
cleaning.
R
: Assembly subject to exchange.
G
: At the time of exchange, wipe off the old grease and apply
new grease.
(Morlytone grease)
IM
: Included in the mechanical chassis unit.
When the mechanical chassis unit is not exchanged, exchange as
a single part is required.
F
: Included in the front-loading unit.
<Note:>
The Hours of use is indicated by the
cylinder rotation time (DRUM RUN).
The maintenance execution time shown in
the chart is recommendation for standard
maintenance execution. This is not the Life
of the various parts. The Life is influenced
by temperature, humidity, dust, etc.
Please refer to the most recent execution
outline, as the maintenance specifications
and the part numbers may change.
Содержание AJ-YA120AG
Страница 3: ... 3 ...
Страница 4: ... 4 AJ HD1200AE ...
Страница 5: ... 5 ...
Страница 6: ... 6 AJ YA120AG AJ YAD120AG ...
Страница 8: ... 8 AJ HD1200AP ...
Страница 9: ... 9 ...
Страница 10: ... 10 AJ HD1200AE ...
Страница 11: ... 11 ...
Страница 12: ... 12 AJ YA120AG AJ YAD120AG ...
Страница 13: ...FCD0405NTKK67E494E495 ...
Страница 312: ...73 73 73 73 31 95 89 MECHANICAL CHASSIS ASSEMBLY 1 MPL 1 ...
Страница 314: ...MECHANICAL CHASSIS ASSEMBLY 2 MPL 3 ...
Страница 316: ...58 59 57 36 59 59 E9 SUB CHASSIS ASSEMBLY MPL 5 37 55 38 39 55 55 57 55 55 ...
Страница 318: ...FRONT LOADING ASSEMBLY MPL 7 E22 112 109 104 109 104 ...
Страница 493: ...E1 2 1 2 3 10 4 5 6 9 1 E2 8 7 PACKING ASSEMBLY AJ YA120AG OPL 3 ...
Страница 495: ...E1 2 1 3 11 4 5 6 7 8 10 9 12 23 E2 24 25 26 26 21 22 27 27 OPL 5 PACKING JACK PANEL ASSEMBLY AJ YAD120AG ...
Страница 552: ...MECHANICAL CHASSIS ASSEMBLY 2 MPL 3 ...
Страница 554: ...58 59 57 36 59 59 E9 SUB CHASSIS ASSEMBLY MPL 5 37 55 38 39 55 55 57 55 55 ...
Страница 556: ...FRONT LOADING ASSEMBLY MPL 7 E22 112 109 104 109 104 ...
Страница 634: ...E1 2 1 2 3 10 4 5 6 9 1 E2 8 7 PACKING ASSEMBLY AJ YA120AG OPL 3 ...
Страница 636: ...E1 2 1 3 11 4 5 6 7 8 10 9 12 23 E2 24 25 26 26 21 22 27 27 OPL 5 PACKING JACK PANEL ASSEMBLY AJ YAD120AG ...