MECH-32
2-9. Mode SW Unit Replacement
(Removal)
1. Confirm that the unit is in the unloading complete
position.
2. Remove the cleaner solenoid unit. (Refer to 2-8)
3. Disconnect the connectors on the Mech. I/F
board.
4. Remove the spring on the cleaner arm unit.
5. Unscrew 3 screws A, and the Motor Bracket Unit.
(Fig.2-9-1)
6. Unscrew the 2 screws B, and the Mode SW Unit.
(Installation)
1. Install a new Mode SW Unit in the reverse steps
of the removal.
2. The pin at the bottom of the Mode SW should be
put into the hole of the Main Cam Gear. (Fig.2-9-1
and 2-9-2)
Fig.2-9-1
Fig.2-9-2
Содержание AJ-YA120AG
Страница 3: ... 3 ...
Страница 4: ... 4 AJ HD1200AE ...
Страница 5: ... 5 ...
Страница 6: ... 6 AJ YA120AG AJ YAD120AG ...
Страница 8: ... 8 AJ HD1200AP ...
Страница 9: ... 9 ...
Страница 10: ... 10 AJ HD1200AE ...
Страница 11: ... 11 ...
Страница 12: ... 12 AJ YA120AG AJ YAD120AG ...
Страница 13: ...FCD0405NTKK67E494E495 ...
Страница 312: ...73 73 73 73 31 95 89 MECHANICAL CHASSIS ASSEMBLY 1 MPL 1 ...
Страница 314: ...MECHANICAL CHASSIS ASSEMBLY 2 MPL 3 ...
Страница 316: ...58 59 57 36 59 59 E9 SUB CHASSIS ASSEMBLY MPL 5 37 55 38 39 55 55 57 55 55 ...
Страница 318: ...FRONT LOADING ASSEMBLY MPL 7 E22 112 109 104 109 104 ...
Страница 493: ...E1 2 1 2 3 10 4 5 6 9 1 E2 8 7 PACKING ASSEMBLY AJ YA120AG OPL 3 ...
Страница 495: ...E1 2 1 3 11 4 5 6 7 8 10 9 12 23 E2 24 25 26 26 21 22 27 27 OPL 5 PACKING JACK PANEL ASSEMBLY AJ YAD120AG ...
Страница 552: ...MECHANICAL CHASSIS ASSEMBLY 2 MPL 3 ...
Страница 554: ...58 59 57 36 59 59 E9 SUB CHASSIS ASSEMBLY MPL 5 37 55 38 39 55 55 57 55 55 ...
Страница 556: ...FRONT LOADING ASSEMBLY MPL 7 E22 112 109 104 109 104 ...
Страница 634: ...E1 2 1 2 3 10 4 5 6 9 1 E2 8 7 PACKING ASSEMBLY AJ YA120AG OPL 3 ...
Страница 636: ...E1 2 1 3 11 4 5 6 7 8 10 9 12 23 E2 24 25 26 26 21 22 27 27 OPL 5 PACKING JACK PANEL ASSEMBLY AJ YAD120AG ...