G
uidance
−15−
STEP 2
Check the connection and set the termination resistor
Programmable controller
or master device
RS-485
communication cable
MECHATROLINK-
䊢
communication cable
NETC01-M3
CRD-KD
FG
FG
Termination
resistor (SW3): ON
STEP 3
Turn on the power and check the setting
Check that the LED condition has become as shown in the figures.
Green Lit
Green Lit
Off
Off
Green Lit
Off
Green Lit
Off
Green Lit
Off
•
When C-ERR (red) of the
CRD-KD
or
NETC01-M3
is lit: Check the transmission rate or address number
of RS-485 communication.
•
When ERR (red) of the
NETC01-M3
is lit: Check the type of the MECHATROLINK-
Ⅲ
communication
error.
Содержание NETC01-M3
Страница 61: ...61...