Assembly and commissioning
Version 1.1.2 dated 2019-05-07
Page 240
Translation of the original instructions
F80 | F105
GB
F
80_F105
_GB
_3.
fm
OPTIMUM
M A S C H I N E N - G E R M A N Y
®
Pneumatic scheme F105
Abb.3-10: F105
3.7
First commissioning
3.7.1
Fill up coolant
INFORMATION
The CNC-machine is delivered without cooling lubricant.
Fill the coolant / lubricant tank with an appropriate cooling lubricant via the machining room
CNC- machine.
"Cooling lubricants“ on page 290
ATTENTION!
Failure of the pumps in case of dry running. The pumps are lubricated by means of the
cooling lubricant. Do not start up the pumps without cooling lubricant.
INFORMATION
Use a water soluble environmentally compliant drilling emulsion as cooling lubricant
procured from the specialised trade.
Make sure that the cooling lubricant is properly absorbed.
Respect the environment when disposing of any lubricants and coolants. Follow the
manufacturer’s disposal instructions.
Option
table
brake
Quick exhaust
valve
Way valve
Way valve
Cylinder tool clamp
Cylinder tool changer
Maintenance unit
Presure switch
Throttle valve
Throttle valve