Assembly and commissioning
Version 1.1.2 dated 2019-05-07
Page 234
Translation of the original instructions
F80 | F105
GB
F
80_F105
_GB
_3.
fm
OPTIMUM
M A S C H I N E N - G E R M A N Y
®
3.5
Installation plan F105
Img.3-3:
Installation plan
3.5.1
Machine mounting
Anchoring-free assembly
If required, use levelling vibration- damping elements for the substructure.
Align the CNC-machine with a machine spirit level.
Check the alignment of the machine after a few days of usage.
A-A ( 0,05 )
A
A
7
8
0
7
4
5
11
8
5
18
6
0
2
2
0
0
8
2
5
2164
2
0
8
0
P
25
400
530
90
1520
1055
7
6
0