Version 1.1.2 7. Mai 2019
6
F80 | F105
DE | GB
OPTIMUM
M A S C H I N E N - G E R M A N Y
®
Installation plan F105 ...........................................................................................................................234
3.5.1 Machine mounting .....................................................................................................................234
3.5.2 Aligning the machine .................................................................................................................236
Installation and assembly .....................................................................................................................236
3.6.1 Mounting the coolant / lubricant tank.........................................................................................236
3.6.2 Assembly of the coolant / lubricant pumps................................................................................237
3.6.3 Corrosion protection ..................................................................................................................237
3.6.4 Connection compressed air supply ...........................................................................................237
Functional test and controls..................................................................................................................241
3.9.1 Warming up the machine .........................................................................................................242
3.9.2 Save data function.....................................................................................................................242
3.9.3 Electrical connection .................................................................................................................242
Regulated drives in connection with residual current devices ..............................................................244
3.10.1 Protection from Dangerous Shock Currents, use of ELCBs......................................................244
3.10.2 Current in the protective earth conductor - Leakage current.....................................................244
3.10.3 When the ELCB triggers............................................................................................................245
Coordinate systems on CNC-machine tools.........................................................................................247
4.2.1 Cartesian coordinate system.....................................................................................................247
4.2.2 Polar coordinate system............................................................................................................248
4.2.3 Machine coordinate system.......................................................................................................248
4.2.4 Workpiece coordinate system ...................................................................................................248
4.2.5 Rotary axes and secondary axes ..............................................................................................249
User interface, machine control panel
Elements on the PPU (Panel Processing Unit) front ............................................................................252
5.2.1 Key combination........................................................................................................................256
Protection levels ...................................................................................................................................262
5.4.1 Passwords.................................................................................................................................263