Chapter 3 - Setup and Installation
Powering On the Storage System
41
Powering On the Storage System
After you have the system setup and installed, you are ready to power on the
storage system enclosure(s).
NOTE:
Ensure that the data cables, power cables, or other objects are not
obstructing the air flow exiting the cooling fan module.
1
Locate the power supply On/Off switches at the rear of the enclosure(s).
2
Press each power supply switch to its “On” position. (Repeat this step for
each of the attached storage system enclosure(s).)
All enclosures will perform a power on self test during their initial start.
NOTE:
It is recommended to wait until the storage system has completed its’
power on self test and the LEDs are indicating it is ready, before
powering on the host system.
3
Next power on the host computer(s) which are connected to the storage
system.
Powering Off the Storage System
1
From your Host system, stop all I/O operations.
2
Access one of the RAID Controller’s software utilities and shutdown the RAID
Controller.
3
After the controller shuts down, power off the enclosure by pressing the
power supply On/Off switches to its “Off” position.
4
Repeat the above step for each of the additional attached storage system
enclosure(s).
4700S.book Page 41 Wednesday, April 6, 2005 2:14 PM
Содержание NexStor 4700S Series
Страница 2: ...4700S book Page 2 Wednesday April 6 2005 2 14 PM...
Страница 8: ...Table of Contents iv 4700S book Page iv Wednesday April 6 2005 2 14 PM...
Страница 74: ...Chapter 5 Troubleshooting Host SCSI Channel Problems 62 4700S book Page 62 Wednesday April 6 2005 2 14 PM...
Страница 90: ...Chapter 6 Maintenance Replacing the Enclosure 78 4700S book Page 78 Wednesday April 6 2005 2 14 PM...
Страница 94: ...Appendix A Technical Information Specifications 82 4700S book Page 82 Wednesday April 6 2005 2 14 PM...
Страница 108: ...Index 96 4700S book Page 96 Wednesday April 6 2005 2 14 PM...
Страница 109: ...4700S book Page 97 Wednesday April 6 2005 2 14 PM...