4 - WORKING OPERATIONS
4-5
CONTROLS
Before starting to work, all operators should familiarize them
-
selves with the location and function of the controls.
Jack
1. The
“Jack”
A
is used to raise and lower the machine
in conjunction with the
“Lift Axle Raise / Lower Control
Lever”
if the operator intends to keep
the machine parallel to the ground for transporting. The
“Jack”
A
is also used to raise the “
Kwik-Pit Hitch”
B
to the towing vehicles drawbar height. The
“Jack”
A
is
located where shown.
(See Fig. # 4-3)
C
B
Turn CCW To
Lower Hitch End
Turn CW To
Raise Hitch End
D
A
E
F
Fig. # 4-3 Jack
Fig. # 4-4 Lift Axle Raise / Lower Control Lever Location
Lower
Raise
Lift Axle Raise /
Lower Control
Lever
HOPPER FLAPS
RAISE LOWER
LEVER
LIFT AXLE
RAISE LOWER
LEVER
90-44-0565
2. The
“Jack”
A
is removable. If the operator has a need to
remove the jack for operational purposes, or maintenance,
follow the next steps.
3. Turn the
“Jack Handle”
E
counter clockwise (CCW) to
lower the machine so the
“Driveover Ramp”
F
is on the
ground, or support with blocks.
4. Remove
“Pin”
C
which secures the
“Jack”
A
to the
“Jack Mount Tube”
D
.
Содержание Kwik-Pit 26 Series
Страница 2: ......
Страница 10: ...1 4 1 GENERAL INFORMATION This Page Is Intentionally Left Blank...
Страница 38: ...2 SAFETY INFORMATION 2 28 Fig 2 29 Warning Decal P N 90 44 0257 Fig 2 30 Safety Decal Location See Fig 2 29...
Страница 46: ...2 SAFETY INFORMATION 2 36 This Page Is Intentionally Left Blank...
Страница 58: ...3 TRANSPORT OPERATIONS 3 12 This Page Is Intentionally Left Blank...
Страница 116: ...5 MAINTENANCE 5 38...
Страница 118: ...5 MAINTENANCE 5 40 This Page Is Intentionally Left Blank...
Страница 120: ...6 TROUBLESHOOTING 6 2 This Page Is Intentionally Left Blank...
Страница 126: ...8 FORMS AND DECLARATIONS 8 2 This Page Is Intentionally Left Blank...
Страница 132: ......