Symposium and DMS/MSL-100 Switch Guide
33
April 2004
Getting started
!
Install the network cable from the router to the Channel Service Unit (CSU)
or any other transport device.
!
Install the client CSU.
!
Configure the connection between the DMS CSU and the client CSU.
!
Configure the connection between the DMS CSU and the client router and
firewall.
!
Configure the connection between the client router and firewall, and the
client applications (for example, IVR system, Windows 2000 Server, and
Symposium Call Center Server).
!
Configure the client-side router and firewall.
Installing and configuring the EIU
To install and configure the EIU, you must perform these tasks on the switch:
!
Install the EIU on the switch.
!
Confirm the EIU is present and lists all entries as displayed in table
LIUINV.
!
Configure an IP address for the switch in table IPNETWRK.
!
Configure IP addresses for the EIU in table IPHOST.
!
Configure the EIU in table IPTHRON.
For more information, refer to the Ethernet Interface Unit User Guide
(NTP 297-8991-910) and the ICM Router Guide (NTP 297-2233-903).
Installing and configuring ICM
To install and configure ICM, you must ensure that the following tasks have
been performed on the switch:
!
Install ICM on the EIU.
!
Configure the office parameters in the following table:
OFCENG
Allocates resources for switch activities.
Содержание 297-2183-912
Страница 2: ......
Страница 4: ......
Страница 6: ...vi Symposium Call Center Server Publication history Standard 1 0 ...
Страница 52: ...52 Symposium Call Center Server Configuring the switch Standard 1 0 ...
Страница 78: ...78 Symposium Call Center Server Configuring the switch Standard 1 0 ...
Страница 110: ...110 Symposium Call Center Server Troubleshooting Standard 1 0 ...
Страница 136: ...136 Symposium Call Center Server Glossary Standard 1 0 ...
Страница 142: ...Reader Response Form Reader Response Form ...
Страница 143: ......