© 2022 Nordson Corporation
3-7
Pump Control Card Addresses
Refer to the
Prodigy HDLV Pump Manifold and Circuit Board
manual for instructions on
setting the control card address and spray gun type switches.
The termination jumper must be installed on W1 pins 1 and 2 on the last pump control
card in the last pump cabinet on the feed center.
NOTE:
The calibration numbers for the HDLV pumps supplying powder to the automatic
spray guns must be entered into the iControl configuration. Refer to the
iControl
Operator
Interface manual for instructions.
Содержание Encore HD iControl 2
Страница 6: ...2022 Nordson Corporation 1609758 04 iv Table of Contents...
Страница 8: ...2022 Nordson Corporation 1609758 04 ii Change Record...
Страница 84: ...2022 Nordson Corporation 1609758 04 4 34 Troubleshooting...
Страница 102: ...2022 Nordson Corporation 1609758 04 6 12 Parts...
Страница 104: ...2022 Nordson Corporation 1609758 04 7 2 Drawings...
Страница 105: ......
Страница 106: ......
Страница 107: ......
Страница 108: ......
Страница 109: ......
Страница 110: ......
Страница 113: ......
Страница 114: ......