i
Contents
Introduction
I. How to Use this Manual --------------------------------------------------------------------------- 3
II. Safety Precautions --------------------------------------------------------------------------------- 4
Facility Installation
I. Unpacking ------------------------------------------------------------------------------------------ 17
II. General Operating Conditions --------------------------------------------------------------- 18
III. Power Requirements ---------------------------------------------------------------------------- 18
IV. Lighting Requirements ------------------------------------------------------------------------- 19
V. Exhaust Requirements ------------------------------------------------------------------------- 19
VI. Leveling the Machine --------------------------------------------------------------------------- 19
VI. Computer Installation --------------------------------------------------------------------------- 20
VIII. Optional Battery Backup Installation ------------------------------------------------------ 21
IX. Final Things to Do ------------------------------------------------------------------------------- 21
X. Sprinkler Fire Suppression System -------------------------------------------------------- 21
XI. Facility Drawings --------------------------------------------------------------------------------- 21
Operating System Software Guide
A. Starting the Program ------------------------------------------------------------------------------ 25
B. Main Operating Screen --------------------------------------------------------------------------- 26
C. Selecting Screen and Function ---------------------------------------------------------------- 27
D. Scheduling Calendar Events ------------------------------------------------------------------- 42
E. Setting Up User Security ------------------------------------------------------------------------- 43
F. Enable Data Logging and Interval Time ----------------------------------------------------- 44
G. Channel Trend Plot Screen Setup ------------------------------------------------------------ 45
H. New User Log On ----------------------------------------------------------------------------------- 46
I. User Log Off ----------------------------------------------------------------------------------------- 46
J. Acknowledge Alarm -------------------------------------------------------------------------------- 46
K. Shutting Down the System ---------------------------------------------------------------------- 47
L. Editing Parameters from the Channel Setup Screen ------------------------------------ 47
M. Modifying A Recipe -------------------------------------------------------------------------------- 48
N. Loading A Recipe ---------------------------------------------------------------------------------- 48
O. Deleting A Recipe ---------------------------------------------------------------------------------- 48
P. Software Version ----------------------------------------------------------------------------------- 48
Q. System Setup ---------------------------------------------------------------------------------------- 49
Standard and Optional Equipment Operating Guide
I. Alarm and Warning Options and Operation ----------------------------------------------- 63
A. Light
Tower
Output ------------------------------------------------------------------------- 63
B. Audible
Alarm Option ---------------------------------------------------------------------- 63
C. Independent Alarm Sensor Option (IAS) --------------------------------------------- 64
D. Power
Hood
Lifts ---------------------------------------------------------------------------- 64
II. Battery Backup Option --------------------------------------------------------------------------- 64
III. Edge Hold Conveyor System and Options ------------------------------------------------- 64
A. Description and Standard Operation -------------------------------------------------- 64
B. Computer Controlled Edge Hold Positioning Option ---------------------------- 64
C. Center Board Support Option ----------------------------------------------------------- 65
D. Board
Counter/Board Drop Option ---------------------------------------------------- 66
E. Upstream and Downstream Machine Interfaces ---------------------------------- 66
Содержание TCM-2200
Страница 5: ...1 Introduction ...
Страница 6: ...2 ...
Страница 18: ...14 ...
Страница 19: ...15 Facility Installation ...
Страница 20: ...16 ...
Страница 26: ...22 ...
Страница 27: ...23 Operating System Software Guide ...
Страница 28: ...24 ...
Страница 55: ...51 ...
Страница 56: ...52 ...
Страница 57: ...53 ...
Страница 58: ...54 ...
Страница 64: ...60 ...
Страница 65: ...61 Standard and Optional Equipment Operating Guide ...
Страница 66: ...62 ...
Страница 71: ...67 Troubleshooting Guide HC1 X or HC2 controller ...
Страница 72: ...68 ...
Страница 74: ...70 ...
Страница 95: ...91 Figure 12 ...
Страница 107: ...103 Maintenance Procedure ...
Страница 108: ...104 ...
Страница 110: ...106 ...