Recommended Maintenance Schedule
PurWater™ 5 Micron Reclaim Systems
With Air Sparger
Maintenance Task Daily Weekly
Monthly Quarterly Est.
Time
Required
1) Check Control Box Power /
Control Switches and Lights
●
<1
Min
2) Check Pump Seal
●
<1
Min
3) Check Pump Pressure
●
<1
Min
4) Clean Basket Strainer
●
5
Min
5) Clean Underflow Orifice
●
5
Min
6) Check Motorized Ball Valve
Operation
●
<1
Min
7) Check Sparger Operation
●
5
Min
8) Remove and Clean Sparger
●
30
Min
Important: Daily visual checks and weekly PM’s can be easily performed by the car
wash operator and will ensure proper operation of the reclaim unit. All
recommended monthly and quarterly maintenance / service should be performed by
a trained and authorized PurClean™ / PurWater™ technician. Contact New Wave
Industries Technical Support @ 800-882-8854 to request the name of the
authorized PurClean™ / PurWater™ technician for your market.
Daily Maintenance Tasks
PW200-5MAS
Control Box
Motorized
Ball Valve
Pump /
Motor
Strainer
Basket
Orifice