x
WiLink-I Modular Base Station System Manual
Contents
1.5.8 Services ............................................................................................................. 18
1.5.9 Physical and Electrical ....................................................................................... 19
Chapter 2 - Installation Guidelines
2.1 Installing the AU-ODU ................................................................................................. 24
2.1.1 AU-ODU Installation Requirements ................................................................... 24
2.1.2 Guidelines for Positioning the AU-ODU ............................................................. 25
2.1.3 IF Cables ............................................................................................................ 25
2.1.4 Pole Mounting the ODU ..................................................................................... 26
2.1.5 AU-ODU ............................................................................................................. 31
2.1.6 Connecting the Cables ....................................................................................... 32
2.2 Installing the Base Station Equipment ...................................................................... 33
2.2.1 BST Installation Requirements........................................................................... 33
2.2.2 WiLink-I-BST-SH Chassis Slot Assignments ..................................................... 34
2.2.3 Power Requirements.......................................................................................... 35
2.2.4 HOT SWAP Support .......................................................................................... 35
2.2.5 Power Interface Unit (PIU) ................................................................................. 35
2.2.6 Power Supply Unit (PSU) ................................................................................... 38
2.2.7 Access Unit Indoor Module (AU-IDU) ................................................................ 39
2.2.8 Network Processing Unit (NPU) ......................................................................... 41
2.2.9 Using the Hot Swap Injector/Ejector Handles .................................................... 44
2.2.10 Installing the Base Station Chassis and Modules .............................................. 46
2.2.11 Air Ventilation Unit (AVU) ................................................................................... 47
2.3 Installing the ODU Power Feeder .............................................................................. 50
2.3.1 Installation Requirements................................................................................... 50
2.3.2 The ODU Power Feeder .................................................................................... 51
2.3.3 Installing the ODU Power Feeder ...................................................................... 52
Содержание WiLink-I 3000
Страница 1: ...System Manual WiLink I Modular Base Station SW Version 2 5 June 2006 ...
Страница 16: ......
Страница 20: ......
Страница 24: ...4 System Description Chapter 1 System Description Figure 1 1 WiLink I System Architecture ...
Страница 42: ......
Страница 74: ......
Страница 214: ......
Страница 240: ......