8-32 System Upgrade
Removing CPU Module
Follow the procedure below to remove the CPU module.
1.
Stop the CPU module you want to remove.
To this end, use the ft series utility of the NEC ESMPRO Agent installed to your server or
the Data Viewer of the NEC ESMPRO Manager.
For the detailed procedure, see "NEC ESMPRO Agent and Manager" - "Maintenance of
NEC Express5800/ft series" in Chapter 5.
NEC ESMPRO Manager
Select [FTServer]
→
[CPU Module]
→
[[*]CPU
Module (to be removed)]
→
[Maintenance]
→
[Bring Up/Bring Down]
→
[Bring Down].
ft series utility
Select [FTServer]
→
[CPU Module]
→
[CPU
Module (to be removed)]
→
[Bring Up/Bring Down]
→
[Down].
After the CPU module enters into off-line status, the status LED will change as follows.
Fail LED: Red
State LED: Off
2.
<Tower model>
Unlock the front bezel with the security key and open it.
<Rack-mount model>
Unlock the front bezel with the security key and remove the upper and lower panels.
3.
Loosen the setscrews that secured the CPU module’s release lever.
4.
Hold the release lever of the CPU module and pull it off.
The CPU module is slightly pulled out toward you.
5.
Firmly hold the handle and pull the CPU module slowly and carefully until the main unit
is locked.
IMPORTANT:
Do not hold the other parts than the release lever to pull
the module.
Содержание Express5800/320Lb FT Linux
Страница 1: ...N8800 027F 028F NEC Express5800 320Lb 320Lb R User s Guide 1st Edition 02 2003 856 122693 901 A ...
Страница 10: ...iv This page is intentionally left blank ...
Страница 16: ...x This page is intentionally left blank ...
Страница 19: ...Precautions for Use 1 3 Label A Label B Label C Label E Label D ...
Страница 20: ...1 4 Precautions for Use Rack mount model Label B Label A Label C Label D ...
Страница 21: ...Precautions for Use 1 5 Label D Label C Label B Label A ...
Страница 22: ...1 6 Precautions for Use PCI CPU Modules PCI Module CPU Module Label A Label A Label A ...
Страница 36: ...1 20 Precautions for Use This page is intentionally left blank ...
Страница 44: ...2 8 General Description Front View inside Tower model Rack mount model ...
Страница 70: ...2 34 General Description This page is intentionally left blank ...
Страница 71: ...Chapter 3 Setup This chapter describes setup procedures to make NEC Express5800 ft series ready for use ...
Страница 118: ...3 48 Setup This page is intentionally left blank ...
Страница 162: ...4 44 System Configuration This page is intentionally left blank ...
Страница 217: ...Installing and Using Utilities 5 55 Also at this time the state of the mirrored disks change to Normal Mirror Disk ...
Страница 294: ...6 14 Maintenance This page is intentionally left blank ...
Страница 295: ...Chapter 7 Troubleshooting If the product does not work properly see this chapter before deciding that it is a breakdown ...
Страница 336: ...7 42 Troubleshooting This page is intentionally left blank ...
Страница 355: ...System Upgrade 8 19 15 Check the disk you selected and click Next 16 Click Complete ...
Страница 399: ...System Upgrade 8 63 Cable ties included with cabinet ...
Страница 410: ...8 74 System Upgrade This page is intentionally left blank ...
Страница 412: ...A 2 Specifications This page is intentionally left blank ...