![background image](http://html.mh-extra.com/html/nec/express5800-120mc2-series/express5800-120mc2-series_user-manual_251191103.webp)
Upgrading Your System 4-31
5.
Disconnect the power cable (A) and ribbon data cable (B) from the device
you are removing.
Removing a Removable Media Device
6.
Remove the device from the peripheral bay by pushing in on its drive rail
clips and then by pulling the device completely out of the bay (see Figure
above).
7.
Install an EMI metal shield over the bay area where you removed the
peripheral device. The EMI shield is secured by just snapping it into place.
8.
Install a filler panel in the open area of the system bezel corresponding to the
bay where the media device was removed.
9.
Replace the side panel and front panel, and power on the system.
10.
Remove the drive serial number from the equipment log.
Содержание Express5800/120Mc2 series
Страница 1: ... U s e r s G u i d e EXPRESS5800 120Mc2 ...
Страница 2: ...xxx ...
Страница 3: ... U s e r s G u i d e EXPRESS5800 120Mc2 ...
Страница 50: ...2 18 Setting Up the System ...
Страница 106: ...4 34 Upgrading Your System Plugging in the AC Power Cords ...
Страница 125: ...A System Cabling System Cabling Before You Begin Static Precautions Standard Configuration RAID Configuration ...
Страница 129: ...System Cabling A 5 A Ultra 160 M SCSI cable 68 pins B IDE cable 40 pins Standard System Cable Routing ...
Страница 132: ...A 8 System Cabling A Ultra 160 M SCSI cable 68 pins B IDE cable 40 pins RAID System Cable Routing ...
Страница 154: ...B 22 Management Workstation Application ...
Страница 155: ...C System Status Hardware Support Information ...
Страница 166: ...10 Glossary ...
Страница 171: ...xx ...
Страница 172: ... 456 01524 000 ...