NX100 Pre-installation Manual
Planning control/monitor connections
Issue 3.2 2017-03-31
Page 8-1
Section 8:
Planning control/monitor
connections
This section describes the types of control and monitoring for the NX100 transmitter. Consider this
information and plan for the necessary requirements (wiring, remote switches/indicators, LAN, etc.):
•
AUI control (local and remote)
•
External system interlock - see page 8-2
•
External PDM inhibit - see page 8-4
•
•
•
Analog outputs - see page 8-12
•
Web based control - see page 8-13
•
SNMP Control/Monitoring - see page 8-14
•
Nautel Phone Home - see page 8-15
AUI control (local and remote)
The NX100’s front door contains an advanced user interface (AUI) that allows you to locally control
all transmitter functions and set parameters and schedules.
The remote AUI allows you to adjust any parameter and view any status available in the local AUI via
a web browser on a computer connected to the LAN connector on the single-board computer’s
motherboard (A1U1) on the back of the control cabinet’s front door.
The NX100 also allows control and monitoring through an Ethernet connection via SNMP,
supporting version 1 of the protocol, with traps.
The local or remote AUI also allow you to configure the remote inputs to control various transmitter
functions and monitor the transmitter’s status by means of a conventional, parallel wire remote
control interface (see
and
connection (see
“Web based control” on page 8-13
).
For detailed information about the AUI, refer to the
NX100 Operating and Maintenance Manual
.
Содержание NX100
Страница 1: ...NX100 Transmitter Pre installation Manual Document NHB NX100 PRE Issue 3 2 2017 03 31 Status Standard...
Страница 2: ......
Страница 4: ......
Страница 8: ...NX100 Pre installation Manual Page 1 viii Issue 3 2 2017 03 31...
Страница 10: ...NX100 Pre installation Manual Page x Issue 3 2 2017 03 31...
Страница 22: ...NX100 Pre installation Manual Page xxii Issue 3 2 2017 03 31...
Страница 24: ...NX100 Pre installation Manual Page xxiv Issue 3 2 2017 03 31...
Страница 28: ...NX100 Pre installation Manual Description Page 1 4 Issue 3 2 2017 03 31...
Страница 32: ...NX100 Pre installation Manual Pre installation tasks Page 2 4 Issue 3 2 2017 03 31...
Страница 42: ...NX100 Pre installation Manual Physical requirements Page 3 10 Issue 3 2 2017 03 31...
Страница 60: ...NX100 Pre installation Manual Electrical requirements Page 5 10 Issue 3 2 2017 03 31...
Страница 85: ...NX100 Pre installation Manual Planning control monitor connections Page 8 16 Issue 3 2 2017 03 31...
Страница 89: ...NX100 Pre installation Manual Parts and tools Page 9 4 Issue 3 2 2017 03 31...
Страница 95: ...NX100 Pre installation Manual Pre installation assistance Page 10 6 Issue 3 2 2017 03 31...
Страница 98: ......