NX100 Pre-installation Manual
Cooling requirements
Issue 3.2 2017-03-31
Page 4-3
Cooling
Do not allow the transmitter room ambient air temperature to exceed 50°C (122°F) at sea level.
Cooler temperatures are recommended in order to improve the reliability of the transmitter. At higher
altitudes, derate the maximum inlet air temperature as follows:
•
De-rate the ambient temperature 3ºC (5.4°F) per 500 m – or 2ºC (3.6°F) per 1,000
feet – above sea level.
Example:
At 1600 m (1 mile) above sea level, maximum ambient temperature should not
exceed 40.4ºC (104.7°F).
Note:
Ensure hot air from the transmitter is not drawn back into the transmitter’s cool air intake.
Cooling plant requirements
In an NX100 system, heat is generated by both the transmitter and the transformer, and each may be
cooled separately. The transmitter’s efficiency is typically 92% and the transformer’s efficiency is 98%.
Calculate the power dissipated by the transmitter using the following equation:
Where
............
is the transmitter’s efficiency and P
out
is the transmitter’s average output power.
Calculate the power dissipated by the power transformer using the following equation:
Where
............
is the transformer’s efficiency. For continuous tone modulation, calculate the average
output power of the transmitter using the following equation:
Where m is the modulation depth and P
c
is the transmitter’s output carrier power.
Содержание NX100
Страница 1: ...NX100 Transmitter Pre installation Manual Document NHB NX100 PRE Issue 3 2 2017 03 31 Status Standard...
Страница 2: ......
Страница 4: ......
Страница 8: ...NX100 Pre installation Manual Page 1 viii Issue 3 2 2017 03 31...
Страница 10: ...NX100 Pre installation Manual Page x Issue 3 2 2017 03 31...
Страница 22: ...NX100 Pre installation Manual Page xxii Issue 3 2 2017 03 31...
Страница 24: ...NX100 Pre installation Manual Page xxiv Issue 3 2 2017 03 31...
Страница 28: ...NX100 Pre installation Manual Description Page 1 4 Issue 3 2 2017 03 31...
Страница 32: ...NX100 Pre installation Manual Pre installation tasks Page 2 4 Issue 3 2 2017 03 31...
Страница 42: ...NX100 Pre installation Manual Physical requirements Page 3 10 Issue 3 2 2017 03 31...
Страница 60: ...NX100 Pre installation Manual Electrical requirements Page 5 10 Issue 3 2 2017 03 31...
Страница 85: ...NX100 Pre installation Manual Planning control monitor connections Page 8 16 Issue 3 2 2017 03 31...
Страница 89: ...NX100 Pre installation Manual Parts and tools Page 9 4 Issue 3 2 2017 03 31...
Страница 95: ...NX100 Pre installation Manual Pre installation assistance Page 10 6 Issue 3 2 2017 03 31...
Страница 98: ......