NX100 Pre-installation Manual
Issue 3.2 2017-03-31
Page xvii
Safety Precautions
This section provides very important information about protecting the safety of personnel and
equipment:
•
Personal Safety - see page xvii
•
•
Equipment Safety - see page xx
Personal Safety
Training
The training of any personnel who will have physical access to the site or the transmitter is very
important. Personnel must be familiar with the transmitter, so that they can avoid physical danger,
and be aware of hazards to themselves and the equipment.
Nautel offers a number of training courses covering the basic fundamentals of RF systems and
transmitters, and the operation and maintenance of the transmitter. For more information about
available courses and schedules, go to the Nautel website at
http://www.nautel.com/Training.aspx
,
or ask your Nautel sales representative.
Site Orientation
When you give personnel access to the transmitter site (e.g., hiring new personnel, or giving access
keys to personnel), perform a site orientation to ensure that they are familiar with the site, on-site
procedures, and on-site hazards. Cover the following topics:
•
Securing the site (locking doors and fences) to prevent unauthorized access
•
How and when to call for technical support or emergency assistance
•
Areas of the site and pieces of equipment that are off limits
Содержание NX100
Страница 1: ...NX100 Transmitter Pre installation Manual Document NHB NX100 PRE Issue 3 2 2017 03 31 Status Standard...
Страница 2: ......
Страница 4: ......
Страница 8: ...NX100 Pre installation Manual Page 1 viii Issue 3 2 2017 03 31...
Страница 10: ...NX100 Pre installation Manual Page x Issue 3 2 2017 03 31...
Страница 22: ...NX100 Pre installation Manual Page xxii Issue 3 2 2017 03 31...
Страница 24: ...NX100 Pre installation Manual Page xxiv Issue 3 2 2017 03 31...
Страница 28: ...NX100 Pre installation Manual Description Page 1 4 Issue 3 2 2017 03 31...
Страница 32: ...NX100 Pre installation Manual Pre installation tasks Page 2 4 Issue 3 2 2017 03 31...
Страница 42: ...NX100 Pre installation Manual Physical requirements Page 3 10 Issue 3 2 2017 03 31...
Страница 60: ...NX100 Pre installation Manual Electrical requirements Page 5 10 Issue 3 2 2017 03 31...
Страница 85: ...NX100 Pre installation Manual Planning control monitor connections Page 8 16 Issue 3 2 2017 03 31...
Страница 89: ...NX100 Pre installation Manual Parts and tools Page 9 4 Issue 3 2 2017 03 31...
Страница 95: ...NX100 Pre installation Manual Pre installation assistance Page 10 6 Issue 3 2 2017 03 31...
Страница 98: ......