NX100 Pre-installation Manual
Pre-installation tasks
Issue 3.2 2017-03-31
Page 2-1
Section 2:
Pre-installation tasks
This section provides a list of tasks that you must perform prior to delivery and installation of the
NX100 transmitter.
Preparing for installation
To prepare for installation of an NX100 transmitter, perform the following tasks:
1. Ensure that the correct transmitter configuration is ordered. Check the ac power
requirements, preset frequency and selected options.
2. Select a location for the transmitter in the transmitter room. Determine whether additional
heating, ventilating or cooling capacity is needed at the site. Identify any special requirements
regarding air flow around the cabinet (for example, ducting hot air away from the cabinet, or
bringing in external cooling air). See
“Selecting a location for the transmitter” on page 2-3
.
3. If this is an upgrade or replacement transmitter (that is, if the site is already set up for a
. (If you are upgrading a site, verify the feedline, the lightning
protection systems, and the ac power service. Refer to Nautel’s
Recommendations for Transmitter
Site Preparation Manual.
)
4. Install ac power service into the planned location of the transmitter, and select a location for
the ac power entrance cabinet
near the transmitter location. For detailed information, see
“Electrical power” on page 5-1
.
Be aware of lightning protection issues when installing ac power. Lightning protection is
essential to protect both personnel and equipment at your site. Refer to Nautel’s
Recommenda-
tions for Transmitter Site Preparation Manual.
5. Install lightning protection on the antenna tower. Refer to Nautel’s
Recommendations for
Transmitter Site Preparation Manual..
6. Place a work area with a clear table surface near the transmitter location. Provide electrostatic
protection measures in the work area.
WARNING: FAILURE TO COMPLY WITH RECOMMENDATIONS MAY VOID
YOUR MANUFACTURER’S WARRANTY. FOR MORE INFORMATION, REVIEW
YOUR WARRANTY DOCUMENTS.
Содержание NX100
Страница 1: ...NX100 Transmitter Pre installation Manual Document NHB NX100 PRE Issue 3 2 2017 03 31 Status Standard...
Страница 2: ......
Страница 4: ......
Страница 8: ...NX100 Pre installation Manual Page 1 viii Issue 3 2 2017 03 31...
Страница 10: ...NX100 Pre installation Manual Page x Issue 3 2 2017 03 31...
Страница 22: ...NX100 Pre installation Manual Page xxii Issue 3 2 2017 03 31...
Страница 24: ...NX100 Pre installation Manual Page xxiv Issue 3 2 2017 03 31...
Страница 28: ...NX100 Pre installation Manual Description Page 1 4 Issue 3 2 2017 03 31...
Страница 32: ...NX100 Pre installation Manual Pre installation tasks Page 2 4 Issue 3 2 2017 03 31...
Страница 42: ...NX100 Pre installation Manual Physical requirements Page 3 10 Issue 3 2 2017 03 31...
Страница 60: ...NX100 Pre installation Manual Electrical requirements Page 5 10 Issue 3 2 2017 03 31...
Страница 85: ...NX100 Pre installation Manual Planning control monitor connections Page 8 16 Issue 3 2 2017 03 31...
Страница 89: ...NX100 Pre installation Manual Parts and tools Page 9 4 Issue 3 2 2017 03 31...
Страница 95: ...NX100 Pre installation Manual Pre installation assistance Page 10 6 Issue 3 2 2017 03 31...
Страница 98: ......