NX100 Pre-installation Manual
Planning control/monitor connections
Page 8-8
Issue 3.2 2017-03-31
Figure 8.3: Differential Input Selected
The normally open/momentarily closed switch should be located between the dc supply's negative
output and the remote input.
Backup control switches
The remote interface PWB contains a push-button switch [
01
(S1) through
16
(S16)] for each of the
16 remote inputs. Each switch provides a means to locally activate its associated remote input in the
event that the associated AUI control is not available. See
switch associated with each of the remote inputs.
Below each switch is a blank, white label to allow for labelling of the control.
Remote input connections
Remote inputs 1 through 16, as required, connect to the terminals of connectors J7, J8 and J9 on the
remote interface PWB (A11A4). See
to determine the input terminal associated
with each remote input.
TO
PWB
1
2
3
16
PWR SUPPLY
(+12V TO +18V)
S2070501 V1
DIGITAL INPUT (01 TO 16)
J6-7/8
REMOTE
EXT
E3
+15V
EXTERNAL DC
01
INTERFACE
DC SUPPLY
REMOTE SELECTION CIRCUITRY
CONFIGURED FOR EXTERNAL
PWB
CONTROL/
INTERFACE
Содержание NX100
Страница 1: ...NX100 Transmitter Pre installation Manual Document NHB NX100 PRE Issue 3 2 2017 03 31 Status Standard...
Страница 2: ......
Страница 4: ......
Страница 8: ...NX100 Pre installation Manual Page 1 viii Issue 3 2 2017 03 31...
Страница 10: ...NX100 Pre installation Manual Page x Issue 3 2 2017 03 31...
Страница 22: ...NX100 Pre installation Manual Page xxii Issue 3 2 2017 03 31...
Страница 24: ...NX100 Pre installation Manual Page xxiv Issue 3 2 2017 03 31...
Страница 28: ...NX100 Pre installation Manual Description Page 1 4 Issue 3 2 2017 03 31...
Страница 32: ...NX100 Pre installation Manual Pre installation tasks Page 2 4 Issue 3 2 2017 03 31...
Страница 42: ...NX100 Pre installation Manual Physical requirements Page 3 10 Issue 3 2 2017 03 31...
Страница 60: ...NX100 Pre installation Manual Electrical requirements Page 5 10 Issue 3 2 2017 03 31...
Страница 85: ...NX100 Pre installation Manual Planning control monitor connections Page 8 16 Issue 3 2 2017 03 31...
Страница 89: ...NX100 Pre installation Manual Parts and tools Page 9 4 Issue 3 2 2017 03 31...
Страница 95: ...NX100 Pre installation Manual Pre installation assistance Page 10 6 Issue 3 2 2017 03 31...
Страница 98: ......