NX100 Pre-installation Manual
Electrical requirements
Issue 3.2 2017-03-31
Page 5-7
Cable tray.
See Figure 5.3. For all interconnecting wiring between the transformer cabinet and
transmitter cabinet, Nautel recommends (and can provide) a cable tray support system (Nautel Part #
207-8385-08, see
). Other options include armoured cable such as Teck90 or
conduit.
The advantages of using a cable tray system are:
•
established, approved, reliable method to route high-current wiring
•
easily accommodates top entry into transmitter cabinets (cable tray is suspended from
ceiling) and supports wire weight
•
fuse assembly on side of transformer cabinet pre-fitted to accept 4” x 18” cable tray;
each transmitter cabinet pre-fitted to accept 4” x 6” cable tray
Cable tray lengths are dependent on the distance between the transformer cabinet and transmitter
cabinets. All cable tray parts can be purchased as part of Nautel’s Cable Tray Parts Kit (Nautel Part
# 207-8385-08). Refer to Figure 5.3 of this manual and to the
NX100 Installation Manual
for details on
installing the cable tray.
Plan your cable tray installation to ensure its position does not interfere with any exhaust ducting
being used see
Содержание NX100
Страница 1: ...NX100 Transmitter Pre installation Manual Document NHB NX100 PRE Issue 3 2 2017 03 31 Status Standard...
Страница 2: ......
Страница 4: ......
Страница 8: ...NX100 Pre installation Manual Page 1 viii Issue 3 2 2017 03 31...
Страница 10: ...NX100 Pre installation Manual Page x Issue 3 2 2017 03 31...
Страница 22: ...NX100 Pre installation Manual Page xxii Issue 3 2 2017 03 31...
Страница 24: ...NX100 Pre installation Manual Page xxiv Issue 3 2 2017 03 31...
Страница 28: ...NX100 Pre installation Manual Description Page 1 4 Issue 3 2 2017 03 31...
Страница 32: ...NX100 Pre installation Manual Pre installation tasks Page 2 4 Issue 3 2 2017 03 31...
Страница 42: ...NX100 Pre installation Manual Physical requirements Page 3 10 Issue 3 2 2017 03 31...
Страница 60: ...NX100 Pre installation Manual Electrical requirements Page 5 10 Issue 3 2 2017 03 31...
Страница 85: ...NX100 Pre installation Manual Planning control monitor connections Page 8 16 Issue 3 2 2017 03 31...
Страница 89: ...NX100 Pre installation Manual Parts and tools Page 9 4 Issue 3 2 2017 03 31...
Страница 95: ...NX100 Pre installation Manual Pre installation assistance Page 10 6 Issue 3 2 2017 03 31...
Страница 98: ......