NX100 Pre-installation Manual
Electrical requirements
Page 5-4
Issue 3.2 2017-03-31
Secondary ac wiring
The following information pertains to the wiring, cable connectors and cable tray support system,
between the external power transformer cabinet and the main transmitter cabinets.
Overview.
See
. The NX100 transmitter requires a 3-phase, 400 V ac source, capable of
providing 171 kVA. The transmitter consists of a main cabinet (rack) and an external power
transformer. The transformer’s secondary supplies three-phase ac power (4-wire: X1, X2, X3, X0) to
the main cabinet. A single-point ground connection is required between the transformer cabinet and
the transmitter’s station reference ground, located on top of the main cabinet. This ac power is
applied to a 3-phase rectifier assembly in the main cabinet.
Figure 5.1: Transformer to Transmitter Interconnect Wiring
Additionally, the main cabinet contains a single-phase 2 kW logic supply that receives its ac input
from one of the three phases and X0.
Note:
It is highly recommended that you purchase suitable wiring, hardware and cable trays from
Nautel. If you decide to purchase these items from an alternate vendor, it is imperative that you
read and understand the information presented in this section, as it provides specific part
information as well as insight into some of Nautel’s design philosophy behind the interconnect
wiring requirements.
Do not
use the provided secondary wiring in place of primary wiring.
WARNING: DO NOT connect the X0 terminal of the power transformer
to ground. Blown fuses and possible damage to the 3-phase SCR may
result.
H3
*
**
A
C
B
COAX
H1
X2
X3
X0
***
RACK
GROUND
REFERENCE
FROM
350 KVA
400V, 3 PHASE
S2070227 V1
H2
TO RACK
6"
X0
1/0 (GREEN) ***
535 MCM *
535 MCM *
REFERENCE
GROUND
STATION
X1
T1
1/0 **
535 MCM *
TRANSMITTER
SHIELD
CABLE TRAY
TO GROUND!
DO NOT CONNECT X0
DENOTES PART # NL WT02 1/0 DLO
CROSS SECTION
DENOTES PART # NL WT01 1/0 DLO
DENOTES PART # NL WT04 535 MCM DLO
Содержание NX100
Страница 1: ...NX100 Transmitter Pre installation Manual Document NHB NX100 PRE Issue 3 2 2017 03 31 Status Standard...
Страница 2: ......
Страница 4: ......
Страница 8: ...NX100 Pre installation Manual Page 1 viii Issue 3 2 2017 03 31...
Страница 10: ...NX100 Pre installation Manual Page x Issue 3 2 2017 03 31...
Страница 22: ...NX100 Pre installation Manual Page xxii Issue 3 2 2017 03 31...
Страница 24: ...NX100 Pre installation Manual Page xxiv Issue 3 2 2017 03 31...
Страница 28: ...NX100 Pre installation Manual Description Page 1 4 Issue 3 2 2017 03 31...
Страница 32: ...NX100 Pre installation Manual Pre installation tasks Page 2 4 Issue 3 2 2017 03 31...
Страница 42: ...NX100 Pre installation Manual Physical requirements Page 3 10 Issue 3 2 2017 03 31...
Страница 60: ...NX100 Pre installation Manual Electrical requirements Page 5 10 Issue 3 2 2017 03 31...
Страница 85: ...NX100 Pre installation Manual Planning control monitor connections Page 8 16 Issue 3 2 2017 03 31...
Страница 89: ...NX100 Pre installation Manual Parts and tools Page 9 4 Issue 3 2 2017 03 31...
Страница 95: ...NX100 Pre installation Manual Pre installation assistance Page 10 6 Issue 3 2 2017 03 31...
Страница 98: ......