NX100 Pre-installation Manual
Page xviii
Issue 3.2 2017-03-31
Voltage Awareness
Ensure that all personnel that are able to access areas with high voltage circuits or high field strengths
are aware of the hazards associated with high voltage. Cover the following topics:
•
High voltage or high field strength areas where caution is required
•
Physical risks of electric shock
•
Risks for personnel with pacemakers or other medical implants
•
Induced voltages in high field strength areas
•
On-site risks during thunderstorms and lightning strikes
•
Operation of safety interlocks (if installed)
First Aid
Nautel does not offer first aid training, since the hazards associated with high voltage and RF energy
are not specific to the transmitter. However, the customer should provide first aid training to all
personnel who have access to the transmitter site. First aid training should include CPR, care of
burns, artificial respiration, and defibrillation if specific equipment is available on-site.
Site Safety
Controlling Access
Transmitters and antennas generate and carry dangerous voltages that can be harmful or fatal. It is
very important that you control access to the site and its equipment. To secure your transmitter site,
use:
•
Locking steel or security doors to prevent casual access
•
A perimeter fence to keep trespassers away from the antenna system and feedline
•
“No Trespassing” signs
•
An alarm system
Содержание NX100
Страница 1: ...NX100 Transmitter Pre installation Manual Document NHB NX100 PRE Issue 3 2 2017 03 31 Status Standard...
Страница 2: ......
Страница 4: ......
Страница 8: ...NX100 Pre installation Manual Page 1 viii Issue 3 2 2017 03 31...
Страница 10: ...NX100 Pre installation Manual Page x Issue 3 2 2017 03 31...
Страница 22: ...NX100 Pre installation Manual Page xxii Issue 3 2 2017 03 31...
Страница 24: ...NX100 Pre installation Manual Page xxiv Issue 3 2 2017 03 31...
Страница 28: ...NX100 Pre installation Manual Description Page 1 4 Issue 3 2 2017 03 31...
Страница 32: ...NX100 Pre installation Manual Pre installation tasks Page 2 4 Issue 3 2 2017 03 31...
Страница 42: ...NX100 Pre installation Manual Physical requirements Page 3 10 Issue 3 2 2017 03 31...
Страница 60: ...NX100 Pre installation Manual Electrical requirements Page 5 10 Issue 3 2 2017 03 31...
Страница 85: ...NX100 Pre installation Manual Planning control monitor connections Page 8 16 Issue 3 2 2017 03 31...
Страница 89: ...NX100 Pre installation Manual Parts and tools Page 9 4 Issue 3 2 2017 03 31...
Страница 95: ...NX100 Pre installation Manual Pre installation assistance Page 10 6 Issue 3 2 2017 03 31...
Страница 98: ......