![NanoString Technologies nCounter Скачать руководство пользователя страница 91](http://html.mh-extra.com/html/nanostring-technologies/ncounter/ncounter_user-manual_705140091.webp)
2017-07 MAN-C0034-06
|
91
NanoString Technologies
®
USER MANUAL
B. Instrument Power Cycling
It is recommended that the system power for each instrument is cycled periodically (for example, once every two weeks after Prep Station
O-ring lubrication). Maintenance and support functions can be accessed from the Main Menu of the Prep Station and Digital Analyzer.
FIGURE 7.1:
This example shows the
Maintenance
button on the Prep Station Main Menu
NOTE:
Users must be assigned Administrator privileges by an Administrator to perform these functions. Only Administrators
may shut down the system.
NOTE:
Shutting down the IVD system will interrupt Cartridge preparation and analysis. Please ensure that all Cartridges have
finished processing on the Digital Analyzer and the Prep Station is not in use before cycling instrument system power.
The following instructions may be used to cycle the system power on either instrument.
1. Select
Power Off
from the Maintenance Menu.
FIGURE 7.2:
The Prep Station Maintenance Menu (left) and Digital Analyzer Maintenance Menu (right)
>>> A confirmation message will appear.