FP0 Hardware
11.2 Troubleshooting
11-5
Matsushita Electric Works (Europe) AG
11.2.2
ERROR/ALARM LED is ON
The system watchdog timer has been activated and the operation of FP0 has been
stopped.
<Condition>
Set the mode switch from PROG. to RUN.
Set the mode switch from RUN to PROG. and turn the power OFF and then ON.
If the ERROR/ALARM LED is turned ON again, there is probably an abnormality
in the FP0. Please contact your dealer.
If the ERROR/ALARM LED is blinking, go to section 11.2.1.
If the ERROR/ALARM LED is turned ON, the program execution time is too long.
Check:
D
if instructions such as JP or LOOP are programmed in such a way
that a scan can never finish.
D
that interrupt instructions are executed in succession.
<Procedure 1 >
<Procedure 2>
11.2.3
All LEDs are OFF
Check the power supply wiring.
Disconnect the power supply wiring to the other devices if the power supplied to the
FP0 control unit is shared with them.
Check if the power supplied to the FP0 control unit is in the range of the rating.
Be sure to check the fluctuation in the power supply.
If the LEDs on the FP0 control unit turn ON at this moment, the capacity of the
power supply is not enough to control other devices as well.
Prepare another power supply for other devices or increase the capacity of the
power supply.
<Procedure 1 >
<Procedure 2>
<Procedure 3>
Содержание FP Series
Страница 12: ...Chapter 1 Overview...
Страница 21: ...FP0 Hardware Overview 1 10 Matsushita Electric Works Europe AG...
Страница 22: ...Chapter 2 Control Units...
Страница 44: ...Chapter 3 Expansion I O Units...
Страница 67: ...FP0 Hardware Expansion I O Units 3 24 Matsushita Electric Works Europe AG...
Страница 68: ...Chapter 4 Analog I O Unit...
Страница 87: ...FP0 Hardware Analog I O Unit 4 20 Matsushita Electric Works Europe AG...
Страница 88: ...Chapter 5 FP0 I O Link Unit MEWNET F...
Страница 102: ...Chapter 6 Power Supply Unit...
Страница 105: ...FP0 Hardware Power Supply Unit 6 4 Matsushita Electric Works Europe AG...
Страница 106: ...Chapter 7 I O Allocation...
Страница 112: ...Chapter 8 Installation...
Страница 122: ...Chapter 9 Wiring...
Страница 139: ...FP0 Hardware Wiring 9 18 Matsushita Electric Works Europe AG...
Страница 140: ...Chapter 10 Trial Operation...
Страница 143: ...FP0 Hardware Trial Operation 10 4 Matsushita Electric Works Europe AG...
Страница 144: ...Chapter 11 Self Diagnostic and Troubleshooting...
Страница 156: ...Appendix A System Registers...
Страница 170: ...Appendix B Special Internal Relays...
Страница 174: ...Appendix C Special Data Registers...
Страница 183: ...FP0 Hardware Special Data Registers C 10 Matsushita Electric Works Europe AG...
Страница 184: ...Appendix D Dimensions...
Страница 195: ...FP0 Hardware Dimensions D 12 Matsushita Electric Works Europe AG...