
FP0 Hardware
4.5
Wiring
4-13
Matsushita Electric Works (Europe) AG
4.5
Wiring
4.5.1
Analog Input Wiring
V 0
I 0
V 1
I 1
COM
V
I
COM
IN
OUT
V 0
I 0
V 1
I 1
COM
V
I
COM
IN
OUT
Voltage input
C
onnect input instrument between IN/V and
IN/COM terminal.
First, connect both IN/V terminal and IN/I terminal.
And then connect input instrument between it and
IN/COM terminal.
Input instrument
(CH1)
Current input
V 0
I 0
V 1
I 1
COM
V
I
COM
IN
OUT
Thermocouple input
(when measured at temperature higher
than the temperature of the terminal)
Connect IN/V terminal to the (+) side of the
thermocouple, and connect IN/COM terminal to the (–)
side of the thermocouple.
(+)
(–)
(+)
V 0
I 0
V 1
I 1
COM
V
I
COM
IN
OUT
Thermocouple input
(when measured at temperature lower
than the temperature of the terminal)
Connect IN/V terminal to the (–) side of the
thermocouple, and connect IN/COM terminal to the
(+) side of the thermocouple.
(–)
(+)
(–)
Thermocouple
(CH0)
Thermocouple
(CH1)
Input instrument
(CH1)
Input instrument
(CH0)
Thermocouple
(CH0)
Thermocouple
(CH1)
Input instrument
(CH0)
Содержание FP Series
Страница 12: ...Chapter 1 Overview...
Страница 21: ...FP0 Hardware Overview 1 10 Matsushita Electric Works Europe AG...
Страница 22: ...Chapter 2 Control Units...
Страница 44: ...Chapter 3 Expansion I O Units...
Страница 67: ...FP0 Hardware Expansion I O Units 3 24 Matsushita Electric Works Europe AG...
Страница 68: ...Chapter 4 Analog I O Unit...
Страница 87: ...FP0 Hardware Analog I O Unit 4 20 Matsushita Electric Works Europe AG...
Страница 88: ...Chapter 5 FP0 I O Link Unit MEWNET F...
Страница 102: ...Chapter 6 Power Supply Unit...
Страница 105: ...FP0 Hardware Power Supply Unit 6 4 Matsushita Electric Works Europe AG...
Страница 106: ...Chapter 7 I O Allocation...
Страница 112: ...Chapter 8 Installation...
Страница 122: ...Chapter 9 Wiring...
Страница 139: ...FP0 Hardware Wiring 9 18 Matsushita Electric Works Europe AG...
Страница 140: ...Chapter 10 Trial Operation...
Страница 143: ...FP0 Hardware Trial Operation 10 4 Matsushita Electric Works Europe AG...
Страница 144: ...Chapter 11 Self Diagnostic and Troubleshooting...
Страница 156: ...Appendix A System Registers...
Страница 170: ...Appendix B Special Internal Relays...
Страница 174: ...Appendix C Special Data Registers...
Страница 183: ...FP0 Hardware Special Data Registers C 10 Matsushita Electric Works Europe AG...
Страница 184: ...Appendix D Dimensions...
Страница 195: ...FP0 Hardware Dimensions D 12 Matsushita Electric Works Europe AG...