FP0 Hardware
10.2 Turning the Power ON
10-3
Matsushita Electric Works (Europe) AG
10.2 Turning the Power ON
After checking the items given on the previous page, perform the trial operation by
adhering to the following procedure.
Procedure:
1.
Before turning ON the power, check the items described on
the previous page
2.
Turn ON the power
3.
Check that the control unit’s PROG. LED is ON
4.
Enter the program
When using a programming tool, perform the operation “Clear Program”
before inputting. Enter the program using NPST-GR software or the FP
programmer
II
Ver.2. Use the programming tool’s “total check function” to
check for syntax errors.
5.
Check output wiring
Use the forced output function to check the output wiring.
6.
Check input wiring
Check the input wiring by watching the ON/OFF status of the input state
LEDs or by using the monitoring function of the programming tool.
7.
Switch the mode switch from PROG. to RUN mode
8.
If the RUN LED turns ON, check the operation of the
program
9.
Edit the program (debug) if necessary
If there is an error in the operation, check the program using the
monitoring function of the programming tool. And then correct the
program.
10.
Save the edited program
We highly recommend to save the newly created program onto a floppy
disk.
Содержание FP Series
Страница 12: ...Chapter 1 Overview...
Страница 21: ...FP0 Hardware Overview 1 10 Matsushita Electric Works Europe AG...
Страница 22: ...Chapter 2 Control Units...
Страница 44: ...Chapter 3 Expansion I O Units...
Страница 67: ...FP0 Hardware Expansion I O Units 3 24 Matsushita Electric Works Europe AG...
Страница 68: ...Chapter 4 Analog I O Unit...
Страница 87: ...FP0 Hardware Analog I O Unit 4 20 Matsushita Electric Works Europe AG...
Страница 88: ...Chapter 5 FP0 I O Link Unit MEWNET F...
Страница 102: ...Chapter 6 Power Supply Unit...
Страница 105: ...FP0 Hardware Power Supply Unit 6 4 Matsushita Electric Works Europe AG...
Страница 106: ...Chapter 7 I O Allocation...
Страница 112: ...Chapter 8 Installation...
Страница 122: ...Chapter 9 Wiring...
Страница 139: ...FP0 Hardware Wiring 9 18 Matsushita Electric Works Europe AG...
Страница 140: ...Chapter 10 Trial Operation...
Страница 143: ...FP0 Hardware Trial Operation 10 4 Matsushita Electric Works Europe AG...
Страница 144: ...Chapter 11 Self Diagnostic and Troubleshooting...
Страница 156: ...Appendix A System Registers...
Страница 170: ...Appendix B Special Internal Relays...
Страница 174: ...Appendix C Special Data Registers...
Страница 183: ...FP0 Hardware Special Data Registers C 10 Matsushita Electric Works Europe AG...
Страница 184: ...Appendix D Dimensions...
Страница 195: ...FP0 Hardware Dimensions D 12 Matsushita Electric Works Europe AG...