![NAiS FP Series Скачать руководство пользователя страница 93](http://html1.mh-extra.com/html/nais/fp-series/fp-series_hardware-manual_3130586093.webp)
FP0 Hardware
FP0 I/O Link Unit (MEWNET–F)
5-6
Matsushita Electric Works (Europe) AG
5.3.3
Master and Slave Stations
Master and Slave Stations
Number of master units per CPU
Max. 4 units.
Number of slave stations per Master unit
Max. 32 units.
Number of I/O points
FP2, FP3, FP–C
Max. 2,048 points
per CPU
FP2SH, FP10SH
Max. 8,192 points
Number of I/O points
per Master unit
CPU unit Ver.:
Lower Ver. than below
Master unit Ver.
Ver. 1.4 or lower
Max. 1,024 points
CPU unit Ver.:
FP3 Ver. 4.6 or higher
FP–C Ver. 4.6 or higher
Master unit Ver.
Ver. 1.5 or higher
Max. 2,048 points
CPU unit Ver.:
FP2, FP2SH, FP10SH Ver.
1.0 or higher
Master unit Ver.
Ver. 1.5 or higher
Max. 4,096 points
Number of I/O points per one I/O Link unit
64 points
(Input 32
Output 32 points)
(see note)
Note
If the I/O Link error flag is on (valid), there are 63 I/O points (Input
31 Output 32 points).
5.3.4
Recommended Cables
Recommended Cables for FP Remote I/O System [MEWNET–F]
Cable
Conductor
Insulator
Diameter of
Communication
Size
Resistance
(at 20
_
C)
Material
Thickness
cable
distance (Total ex-
tension)
Twisted pair
cable
with shield
Min.1.25mm
2
(AWG16 or larger)
Max. 16.8
Ω
/km
Polyethylene Max. 0.5mm
Approx.
8.5mm
700m
(300m,
see note 5
)
Min.0.5mm
2
(AWG20 or larger)
Max. 33.4
Ω
/km
Polyethylene Max. 0.5mm
Approx.
7.8mm
600m
(300m,
see note 5
)
Vinyl Cab-
tyre Cable
(VCTF)
Min.0.75mm
2
(AWG18 or larger)
Max. 25.1
Ω
/km
Polyvinyl
Chloride
Max. 0.6mm
Approx.
6.6mm
400m
(200m,
see note 5
)
Содержание FP Series
Страница 12: ...Chapter 1 Overview...
Страница 21: ...FP0 Hardware Overview 1 10 Matsushita Electric Works Europe AG...
Страница 22: ...Chapter 2 Control Units...
Страница 44: ...Chapter 3 Expansion I O Units...
Страница 67: ...FP0 Hardware Expansion I O Units 3 24 Matsushita Electric Works Europe AG...
Страница 68: ...Chapter 4 Analog I O Unit...
Страница 87: ...FP0 Hardware Analog I O Unit 4 20 Matsushita Electric Works Europe AG...
Страница 88: ...Chapter 5 FP0 I O Link Unit MEWNET F...
Страница 102: ...Chapter 6 Power Supply Unit...
Страница 105: ...FP0 Hardware Power Supply Unit 6 4 Matsushita Electric Works Europe AG...
Страница 106: ...Chapter 7 I O Allocation...
Страница 112: ...Chapter 8 Installation...
Страница 122: ...Chapter 9 Wiring...
Страница 139: ...FP0 Hardware Wiring 9 18 Matsushita Electric Works Europe AG...
Страница 140: ...Chapter 10 Trial Operation...
Страница 143: ...FP0 Hardware Trial Operation 10 4 Matsushita Electric Works Europe AG...
Страница 144: ...Chapter 11 Self Diagnostic and Troubleshooting...
Страница 156: ...Appendix A System Registers...
Страница 170: ...Appendix B Special Internal Relays...
Страница 174: ...Appendix C Special Data Registers...
Страница 183: ...FP0 Hardware Special Data Registers C 10 Matsushita Electric Works Europe AG...
Страница 184: ...Appendix D Dimensions...
Страница 195: ...FP0 Hardware Dimensions D 12 Matsushita Electric Works Europe AG...