8 - 16
8. BUS CONNECTION
8.2 System Configuration
When two GOTs are connected
*1
For the extension cables, refer to MELSEC-A/QnA catalog (L(NA)08024).
*2
When installing the 1st GOT 30m or more away from the main base unit, the bus connector conversion box is required.
*3
When connecting to multiple GOTs with GT27, GT 16, GT15 and GT11 mixed, use GT11 as a terminal.
*4
When using GT15-C
EXSS-1 or GT15-C
BS, connect as following precautions.
8.4.1 GT15-C [ ] EXSS-1, GT15-C [ ] BS
*5
The number of connectable GOTs is restricted according to the CPU type and the number of intelligent function modules.
8.4.12 When connecting multiple GOTs
Extension base
unit
Bus extension
connector box
1st GOT
Main base unit
Connection cable 1)
Connection cable 2)
Extension cable
2nd GOT
Connection cable 3)
Communication driver
Bus(A/QnA)
PLC
*5
Connection cable 2)
GOT (1st)
*3
Extension
base
Extension
cable
*1
Main base
Connection cable 1)
Bus connector
conversion box
Option device
*6*7
Model
-
-
Main base
-
-
GT15-A1SC07B(0.7m)
GT15-A1SC12B(1.2m)
GT15-A1SC30B(3m)
GT15-A1SC50B(5m)
GT15-75ABUS2L
GT15-ABUS2
-
-
GT15-C100EXSS-1(10m)
GT15-C200EXSS-1(20m)
*4
GT15-A1SC05NB(0.45m)
GT15-A1SC07NB(0.7m)
GT15-A1SC30NB(3m)
GT15-A1SC50NB(5m)
A7GT-CNB
*2
GT15-C100EXSS-1(10m)
GT15-C200EXSS-1(20m)
*4
GT15-75ABUS2L
GT15-ABUS2
Extension
base
Extension
cable
Main base
-
-
GT15-A1SC07B(0.7m)
GT15-A1SC12B(1.2m)
GT15-A1SC30B(3m)
GT15-A1SC50B(5m)
-
-
GT15-C100EXSS-1(10m)
GT15-C200EXSS-1(20m)
*4
GT15-75ABUS2L
GT15-ABUS2
GT15-A1SC05NB(0.45m)
GT15-A1SC07NB(0.7m)
GT15-A1SC30NB(3m)
GT15-A1SC50NB(5m)
A7GT-CNB
*2
GT15-C100EXSS-1(10m)
GT15-C200EXSS-1(20m)
*4
Содержание GOT2000 Series
Страница 2: ......
Страница 62: ...1 38 1 PREPARATORY PROCEDURES FOR MONITORING 1 6 Checking for Normal Monitoring ...
Страница 64: ......
Страница 80: ...2 16 2 DEVICE RANGE THAT CAN BE SET 2 6 MELSEC WS ...
Страница 246: ...7 26 7 COMPUTER LINK CONNECTION 7 6 Precautions ...
Страница 252: ...8 6 8 BUS CONNECTION 8 1 Connectable Model List ...
Страница 256: ...8 10 8 BUS CONNECTION 8 2 System Configuration ...
Страница 288: ...8 42 8 BUS CONNECTION 8 4 Precautions ...
Страница 324: ...9 36 9 MELSECNET H CONNECTION PLC TO PLC NETWORK MELSECNET 10 CONNECTION PLC TO PLC NETWORK ...
Страница 416: ......
Страница 510: ...15 46 15 SERVO AMPLIFIER CONNECTION 15 7 Precautions ...
Страница 518: ...16 8 16 ROBOT CONTROLLER CONNECTION 16 6 Precautions ...
Страница 540: ...17 22 17 CNC CONNECTION 17 7 Precautions ...
Страница 541: ...MULTIPLE GOT CONNECTIONS 18 GOT MULTI DROP CONNECTION 18 1 ...
Страница 542: ......
Страница 567: ...MULTI CHANNEL FUNCTION 19 MULTI CHANNEL FUNCTION 19 1 ...
Страница 568: ......
Страница 592: ...19 24 19 MULTI CHANNEL FUNCTION 19 3 GOT Side Settings Example Setting example for Ethernet connection 4 channels ...
Страница 599: ...FA TRANSPARENT FUNCTION 20 FA TRANSPARENT FUNCTION 20 1 ...
Страница 600: ......
Страница 668: ...20 68 20 FA TRANSPARENT FUNCTION 20 7 Precautions ...
Страница 670: ...REVISIONS 2 ...
Страница 673: ......