
GENERAL
1 - 9
3. Disassembly
/
Reassembly Notes
This Service Manual specifies various procedures
recommended by Mitsubishi Heavy Industries, Ltd. for
servicing Mitsubishi diesel engines. These procedures
include, wherever appropriate, required special tools
and related safety precautions.
The instructions provided in this manual, however,
cannot fully guarantee safety as potential risks beyond
ordinary imagination are hidden everywhere.
When conduct any work, the following points should
also be observed in addition to the instructions this
manual.
3.1 Disassembly
(1)
Use tools and equipment that are appropriate for
the work being carried out.
(2)
Whenever necessary, use workbenches to work
on or sort parts out. Disassemble in accordance
with the disassembly sequence given in the
manual.
(3)
As parts are disassembled, place them neatly in
the order of removal to eliminate missing parts
on reassembly.
(4)
During disassembly, note the assembly marks.
Remember to respect these marks on reassembly.
Whenever appropriate, put additional assembly
marks to aid reassembly.
(5)
Before and during disassembly as well as during
subsequent washing, carefully check for any
abnormality or other fault which otherwise may
likely remain unnoticed afterwards.
(6)
Pay sufficient attention to ensure safety,
especially when lifting or carrying heavy
components and parts. (Use a jack or a chain
block as required.)
3.2 Reassembly
(1)
Parts excluding oil seals, O-rings, rubber sheets,
etc. should be thoroughly washed in wash oil and
completely dried using compressed air.
(2)
Use appropriate tools and equipment.
(3)
Use good-quality oil and grease. Never fail to
apply oil, grease, sealant and adhesive to the
relevant locations if so instructed in the manual.
Содержание diesel engines
Страница 5: ......
Страница 33: ...SERVICE STANDARDS 1 20 ...
Страница 34: ...1 General Tools 1 22 2 Special Tools 1 23 TOOLS LIST ...
Страница 37: ...TOOLS LIST 1 24 ...
Страница 38: ...1 Identifying the Timing for Overhaul 1 26 2 Measuring the Compression Pressure 1 27 OVERHAUL TIMING ...
Страница 41: ...OVERHAUL TIMING 1 28 ...
Страница 46: ......
Страница 47: ......
Страница 61: ...ENGINE MAIN PARTS DISASSEMBLY 2 16 ...
Страница 99: ...FUEL SYSTEM REMOVAL 3 8 ...
Страница 115: ...FUEL SYSTEM DISASSEMBLY INSPECTION AND REASSEMBLY 3 24 ...
Страница 117: ...FUEL SYSTEM INSTALLATION 3 26 1 Fuel Injection Pumps Installing the fuel injection pumps Installation sequence ...
Страница 119: ...FUEL SYSTEM INSTALLATION 3 28 2 Governor Installing the governor Installation sequence ...
Страница 123: ...FUEL SYSTEM INSTALLATION 3 32 ...
Страница 131: ...OIL SYSTEM DISASSEMBLY INSPECTION AND REASSEMBLY 4 8 ...
Страница 143: ...COOLING SYSTEM DISASSEMBLY INSPECTION AND REASSEMBLY 5 8 ...
Страница 150: ......
Страница 151: ......
Страница 153: ...INLET AND EXHAUST SYSTEMS REMOVAL 6 4 ...
Страница 159: ...INLET AND EXHAUST SYSTEMS INSTALLATION 6 10 ...
Страница 160: ...1 Starter 7 2 2 Alternator 7 3 3 Stop Solenoid 7 4 4 Glow Plug 7 5 ELECTRICAL SYSTEM REMOVAL ...
Страница 161: ...ELECTRICAL SYSTEM REMOVAL 7 2 1 Starter Removal of the starter Removal sequence Harness Bolt Starter ...
Страница 164: ...ELECTRICAL SYSTEM REMOVAL 7 5 4 Glow Plug Removal of the glow plug Removal sequence Glow plug Connection plate ...
Страница 165: ...ELECTRICAL SYSTEM REMOVAL 7 6 ...
Страница 184: ...1 Glow Plug 7 26 2 Stop Solenoid 7 27 3 Alternator 7 28 4 Starter 7 29 ELECTRICAL SYSTEM INSTALLATION ...
Страница 189: ...ELECTRICAL SYSTEM INSTALLATION 7 30 ...
Страница 207: ...MISCELLANEOUS 9 4 ...