-
-
'15 • HM-T-246
3) Open the drain valve C to drain water. Close the valve after draining.
4) Disconnect the joints from the hot water supply and the water return pipe sides. Blow air from the hot
water supply pipe joint till no water is forced out from the water return pipe any more.
* When using a nitrogen gas container, or other, always set the pressure no higher than 0. MP a.
5) Blow air from the hot water supply pipe side after opening the valve A and closing the return side by a
hand. When water has been drained completely, close the valve A.
Repeat the same also on the valves B and C.
This is all for the water draining work. Restore
the pipe connection after the work.
(Caution)
When water is charged again later, test run the water pump to bleed air securely before operating the unit. P lease note that it may
take time before the unit operation stabilizes.
A
B
C
Hot water supply pipe joint
Water supply pipe joint
AMP Air Conditioning
www.ampair.co.uk | [email protected]
Содержание ESA30E-25
Страница 33: ... 15 HM T 246 Rear view Power transformer AMP Air Conditioning www ampair co uk sales ampair co uk ...
Страница 69: ... 15 HM T 246 AMP Air Conditioning www ampair co uk sales ampair co uk ...
Страница 71: ... 15 HM T 246 0 WARNING CAUTION AMP Air Conditioning www ampair co uk sales ampair co uk ...
Страница 85: ... 15 HM T 246 4 3 System diagram 㪄㪈㪌㪄 AMP Air Conditioning www ampair co uk sales ampair co uk ...
Страница 91: ... 15 HM T 246 0 CAUTION AMP Air Conditioning www ampair co uk sales ampair co uk ...