-
0
-
'15 • HM-T-246
(e) After mounting new compressor
1) Attaching crank case heater and under-dome temperature sensor
Insert the insulation jacket from left side of compressor and
wrap it around compressor.
And then band it in front of the compressor.
N ote: Do not forget to put top insulation cover on the
compressor.
2) Wrapping the insulation jacket around the compressor
Be sure to attach them before wrapping the insulation jacket
around the compressor.
3) Attaching discharge pipe temperature sensor and gas injection temperature sensor
P ut them back the way they were.
AMP Air Conditioning
www.ampair.co.uk | [email protected]
Содержание ESA30E-25
Страница 33: ... 15 HM T 246 Rear view Power transformer AMP Air Conditioning www ampair co uk sales ampair co uk ...
Страница 69: ... 15 HM T 246 AMP Air Conditioning www ampair co uk sales ampair co uk ...
Страница 71: ... 15 HM T 246 0 WARNING CAUTION AMP Air Conditioning www ampair co uk sales ampair co uk ...
Страница 85: ... 15 HM T 246 4 3 System diagram 㪄㪈㪌㪄 AMP Air Conditioning www ampair co uk sales ampair co uk ...
Страница 91: ... 15 HM T 246 0 CAUTION AMP Air Conditioning www ampair co uk sales ampair co uk ...