![Mitsubishi Electric Q06CCPU-V Скачать руководство пользователя страница 239](http://html.mh-extra.com/html/mitsubishi-electric/q06ccpu-v/q06ccpu-v_user-manual_1811831239.webp)
6
PREPARATORY PROCEDURES AND SETTING
6.3 Preparatory Procedure and Setting
6
- 21
1
O
V
ER
VI
E
W
2
SY
STEM
CONFIGURA
TION
3
SP
ECIFICA
T
IONS
4
FUNCTIONS
5
A
C
C
E
SS V
IA
N
E
TW
OR
K
MODUL
ES
6
P
R
EP
AR
A
T
OR
Y
PROCE
DUR
ES
A
ND
S
E
TTING
7
I/O NUM
BER
ASS
IGN
M
EN
T
8
M
E
M
O
RIE
S
A
ND
FI
L
E
S
(a) Precautions
When having replaced a C Controller module, restart all connected devices
(gateway server, personal computers, etc.)
(If any of these devices retains an Ethernet address of its communication target,
continued communication may be disabled after the replacement because the
Ethernet address is changed.)
Likewise, restart a C Controller module when a target device has been replaced.
Figure 6.14 Flowchart for CC-Link IE controller network startup (continued)
1
Programming
1) Create a user program with Workbench or Tornado.
2) Debug the user program.
3) Register the user program to the C Controller module.
Check the LEDs on each module for error.
If an error occurs in the C Controller module, troubleshoot
the problem, referring to the following.
If an error occurs in a CC-Link IE controller network
module, troubleshoot the problem, referring to the CC-Link
IE controller network module manual.
For actions to be taken with GX Works2/GX Developer,
refer to the following.
If an error occurs in other than the C Controller module,
troubleshoot the problem, referring to the manual for the
module.
Troubleshooting
Operation
4) Back up the standard RAM data not to lose them due to
expiry of battery life. (Q12DCCPU-V only)
C Controller Module User's Manual
(Utility Operation, Programming)
(
Page 6-22, Section 6.3 (4) (b))
(
(
Содержание Q06CCPU-V
Страница 2: ......
Страница 612: ...APPX 48 Appendix 11 Functions Added by Version Upgrade APPENDICES Memo ...
Страница 617: ......