- 158 -
[
VII
Control ]
-15- Control at Initial Start-up <PURY>
When the unit is started for the first time, it will run the following course of operation.
(1) Flow chart of initial operation mode
(2) Initial start-up control of P168-P234 models: time chart
Example
[Restrictions for the initial setup mode during heating]
When the compressor discharge SH is small or the discharge pressure is low in heating only, heating main, or cooling
main mode, the total capacity of operable outdoor unit will be restricted.(other than when there is only one indoor unit)
[Total capacity of operable indoor unit]
In case of Indoor unit of P72 model: P32 model or less
In case of outdoor unit of P96-P234 models: P52 model or less
Start of initial operation mode
Step 1
P72~P144
P168~P234
Operation of No.1 compressor only
Exception : Completed if discharge superheat reaches above 25 C [77 F] within
5 minutes of start-up.
Step 3
Forced operation of No.2 compressor only
Completed in the integrated operation time of 5 minutes
Completion of initial operation mode
f 60 Hz. Completed in the continuous integrated operation time of
20 minutes or in the integrated operation time of 90 minutes.
60 Hz or lessfor the first 30 minutes , 85 Hz or less after 30 minutes.
No.2 compressor not in operation.
Completed in the integrated operation time of 40 minutes.Completed in
the integrated operation time of 40 minutes
:
:
P168 - P234 types
P72 - P144 types
No.1 compressor
ON/OFF
No.2 compressor
ON/OFF
Completion of initial operation mode
40 minutes
Step 1
Step 3
5 minutes
Содержание PUHY-P168
Страница 11: ... 2 ...
Страница 23: ... 14 ...
Страница 25: ... 16 ...
Страница 38: ... 29 II Restrictions ...
Страница 42: ... 33 II Restrictions ...
Страница 46: ... 37 II Restrictions ...
Страница 50: ... 41 II Restrictions ...
Страница 54: ... 45 II Restrictions ...
Страница 58: ... 49 II Restrictions ...
Страница 75: ... 66 ...
Страница 99: ... 90 III Outdoor Unit BC Controller Components 2 RELAY BOARD RELAY 4 board 3 RELAY BOARD RELAY 10 board ...
Страница 101: ... 92 ...
Страница 111: ... 102 ...
Страница 113: ... 104 ...
Страница 126: ... 117 VI Refrigerant Circuit 1 Refrigerant Circuit Figure 119 2 Principal Parts and Functions 126 ...
Страница 127: ... 118 ...
Страница 134: ... 125 VI Refrigerant Circuit 3 CMB P104 and P108NU GB sub TH25 TH22 LEV3a CP Solenoid valves Block Check valves Block ...
Страница 145: ... 136 ...
Страница 147: ... 138 ...
Страница 185: ... 176 ...
Страница 187: ... 178 ...
Страница 241: ... 232 ...
Страница 243: ... 234 ...
Страница 366: ... 357 IX Troubleshooting ...
Страница 367: ... 358 ...
Страница 368: ... 359 X LED monitor display on the outdoor unit board 1 How to read the LED on the service monitor 361 ...
Страница 369: ... 360 ...