[8-15 Main-HBC Maintenance Instructions ]
BS_08_L
chapter 8 -
165
8 Troub
le
sho
o
ting Bas
e
d on Ob
ser
ved
Sy
mp
toms
Operation procedures
Illustrations
Operation
location
8) Cut the pipes and remove the braze
where indicated to remove the four-way
valve ASSY from the unit.
9) Pull the four-way valve ASSY out.
Installation
location
10) Braze the supplied new pipe to the pipe
on the unit where the pipes of the old
four-way valve ASSY were cut out.
See the figure at right for how to adjust
the pipe length and braze the pipes.
11) Hold the new four-way ASSY in place
with the clamps and the packing to the
sheet metal, and braze the pipes.
12) Re-place the pipe ASSY and the pipe
covers as they were.
Remove the braze.
Cut the pipes.
110 mm
Braze the supplied pipe (expanded
on one end) to the pipe on the unit,
and cut the end of the pipe off so
that the straight section of the pipe
will be 110 mm.
Braze the new pipe
(expanded on both
ends).
0000006416.BOOK 165 ページ 2021年10月26日 火曜日 午後5時30分
Содержание City Multi PURY-EM200YNW-A1
Страница 1: ......
Страница 11: ...GB_BS_01_L 0000006448 BOOK 2 ページ 2021年10月6日 水曜日 午後1時57分 ...
Страница 35: ...GB_BS_02_L 0000006407 BOOK 2 ページ 2021年10月12日 火曜日 午後4時22分 ...
Страница 69: ...GB_BS_03_L 0000006412 BOOK 2 ページ 2021年10月12日 火曜日 午後4時33分 ...
Страница 97: ...GB_BS_04_L 0000006414 BOOK 2 ページ 2021年10月12日 火曜日 午後4時43分 ...
Страница 131: ...GB_BS_05_M 0000006450 BOOK 2 ページ 2021年10月26日 火曜日 午後7時2分 ...
Страница 165: ...GB_BS_06_F2 0000006532 BOOK 2 ページ 2021年10月8日 金曜日 午前11時51分 ...
Страница 173: ...GB_BS_07_M 0000006452 BOOK 4 ページ 2021年10月27日 水曜日 午前9時38分 ...
Страница 267: ...GB_BS_08_L 0000006416 BOOK 4 ページ 2021年10月26日 火曜日 午後5時30分 ...
Страница 451: ...GB_BS_09_F 0000006418 BOOK 2 ページ 2021年10月13日 水曜日 午前10時38分 ...
Страница 469: ...GB_BS_10_M 0000006456 BOOK 2 ページ 2021年10月26日 火曜日 午後7時49分 ...
Страница 502: ......