[8-12 Measures for Refrigerant Leakage ]
66
-
chapter 8
BS_08_L
8 Troub
le
sho
o
ting Bas
e
d on Ob
ser
ved
Sy
mp
toms
8-12 Measures for Refrigerant Leakage
1. Leak spot: In the case of extension pipes and HBC (Cooling season)
1) Mount a pressure gauge on the service check joint (CJ2) on the low-pressure side.
2) Connect the service port on the high-pressure gas service valve (BV2) to that on the low-pressure gas service valve (BV1)
using a charge hose.
3) Stop all the indoor units. While the compressor is being stopped, turn the high-pressure gas service valve (BV2) on the outdoor
unit 45 degrees in the close direction as shown below, and fully open the low-pressure gas service valve (BV1). (Do not close
BV2 completely. Closing BV2 will cause the unit to stop in step 4.)
*Pump down operation can be performed with BV1 and BV2 open, except that it will take longer to collect refrigerant.
4) Stop all the indoor units; turn on SW4 (912) on the outdoor unit control board while the compressor is being stopped. (Pump
down mode will start, and all the indoor units will run in cooling test run mode.)
5) In the pump down mode (SW4 (912)), all the indoor units and compressors will automatically stop when the low pressure
(63LS) reaches 0.383MPa [55psi] or less or 15 minutes have passed after the pump mode started. Stop all the indoor units
and compressors when the pressure indicated by the pressure gauge, which is on the check joint (CJ2) for low-pressure ser-
vice, reaches 0.383MPa [55psi] or 20 minutes pass after the pump down operation is started.
6) Close the service ball valve (BV1) on the low-pressure pipe and the service ball valve (BV2) on the high-pressure pipe on the
outdoor unit.
7) Collect the refrigerant that remains in the extended pipe for the indoor unit. Do not discharge refrigerant into the atmosphere
when it is collected.
8) Repair the leak.
9) After repairing the leak, vacuum the extension pipe and the indoor unit
*1
.
10) To adjust refrigerant amount, open the ball valves (BV1 and BV2) inside the outdoor unit, and turn off SW4 (912).
2. Leak spot: In the case of outdoor unit (Cooling season)
(1) Run all the indoor units in the cooling test run mode.
1) To run the indoor unit in test run mode, turn SW4 (769) on the outdoor unit control board to ON.
2) Change the setting of the remote controller for all the indoor units to the cooling mode.
3) Check that all the indoor units are performing a cooling operation.
(2) Stop all the indoor units, and stop the compressor.
1) To stop all the indoor units and the compressors, turn SW4 (769) on the outdoor control board from ON to OFF.
2) Check that all the indoor units are being stopped.
(3) Close the ball valves (BV1 and BV2).
(4) Collect the refrigerant that remains inside the outdoor unit. Do not discharge refrigerant into air
into the atmosphere when it is collected.
(5) Repair the leak.
(6) After repairing the leak, replace the dryer with the new one, and perform evacuation
*1
inside
the outdoor unit.
(7) To adjust refrigerant amount, open the ball valves (BV1 and BV2) inside the outdoor unit.
*1. For details, refer to the following page(s). [1-3-3 Vacuum Drying]
45°
0000006416.BOOK 66 ページ 2021年10月26日 火曜日 午後5時30分
Содержание City Multi PURY-EM200YNW-A1
Страница 1: ......
Страница 11: ...GB_BS_01_L 0000006448 BOOK 2 ページ 2021年10月6日 水曜日 午後1時57分 ...
Страница 35: ...GB_BS_02_L 0000006407 BOOK 2 ページ 2021年10月12日 火曜日 午後4時22分 ...
Страница 69: ...GB_BS_03_L 0000006412 BOOK 2 ページ 2021年10月12日 火曜日 午後4時33分 ...
Страница 97: ...GB_BS_04_L 0000006414 BOOK 2 ページ 2021年10月12日 火曜日 午後4時43分 ...
Страница 131: ...GB_BS_05_M 0000006450 BOOK 2 ページ 2021年10月26日 火曜日 午後7時2分 ...
Страница 165: ...GB_BS_06_F2 0000006532 BOOK 2 ページ 2021年10月8日 金曜日 午前11時51分 ...
Страница 173: ...GB_BS_07_M 0000006452 BOOK 4 ページ 2021年10月27日 水曜日 午前9時38分 ...
Страница 267: ...GB_BS_08_L 0000006416 BOOK 4 ページ 2021年10月26日 火曜日 午後5時30分 ...
Страница 451: ...GB_BS_09_F 0000006418 BOOK 2 ページ 2021年10月13日 水曜日 午前10時38分 ...
Страница 469: ...GB_BS_10_M 0000006456 BOOK 2 ページ 2021年10月26日 火曜日 午後7時49分 ...
Страница 502: ......