System Installation 3-7
NOTE:
Make sure to allow sufficient slack in the cable so that the plug is not pulled out of the
wall if the system is moved slightly.
3.3.3 Connecting ECG
Connect the ECG cable to the corresponding interface on the physio panel under the control panel.
See “2.1.2.3 Physio Panel” for details.
3.3.4 Installing Probe/Gel Holder
As shown in the figure below, align the buckle of the holder to the slot at the side of the control panel
and then insert the buckle into the slot until the buckle clicks and locks.
Grounding terminal
Содержание DC-68
Страница 2: ......
Страница 12: ......
Страница 18: ......
Страница 30: ......
Страница 45: ...System Installation 3 15...
Страница 54: ......
Страница 72: ......
Страница 90: ......
Страница 108: ...8 2 Field Replaceable Unit 8 1 Explosive View A0 B0 C0 D0 E0 F0 G0...
Страница 121: ...Field Replaceable Unit 8 15 8 2 5 Main Unit Assembly E0 E2 E4 E6 E5 E9 E8 E3 E7 E1...
Страница 123: ...Field Replaceable Unit 8 17 E13 E22 E10 E17 E16 E14 E18 E19 E23 E20 E21 E15 E11 E12 E24...
Страница 134: ......
Страница 180: ......
Страница 212: ......
Страница 254: ......
Страница 258: ......
Страница 280: ......
Страница 281: ...P N 046 011984 00 7 0...