12-2 Care and Maintenance
No.
Item
Frequency
Method
3.
Trackball cleaning
1 time/month
Ditto
4.
Control Panel/minor panel cleaning
1 time/month
Ditto
5.
Probe cleaning (head of the probe)
Every time after
use
Ditto
6.
Probe cable and connector cover
cleaning
1 time/month
Ditto
7.
Holder cleaning
1 time/month
Ditto
8.
Cover cleaning
1 time/month
Ditto
9.
Peripherals cleaning
1 time/month
See
Chapter 12.2.2
10.
Probe appearance check
1 time/day
See
Chapter 12.3.1
11.
Check for power supply cable, power
supply plug.
1 time/month
See
Chapter 12.3.1
12.
Battery check
2 times/year
See
Chapter 12.3.1
13.
Check for peripherals and optional
functions
1 time/year
See
Chapter 12.3.3
14.
Mechanical safety check
1 time/year
See
Chapter 12.3.4
15.
Check for electrical safety
Every two years
See
Appendix A
Содержание DC-68
Страница 2: ......
Страница 12: ......
Страница 18: ......
Страница 30: ......
Страница 45: ...System Installation 3 15...
Страница 54: ......
Страница 72: ......
Страница 90: ......
Страница 108: ...8 2 Field Replaceable Unit 8 1 Explosive View A0 B0 C0 D0 E0 F0 G0...
Страница 121: ...Field Replaceable Unit 8 15 8 2 5 Main Unit Assembly E0 E2 E4 E6 E5 E9 E8 E3 E7 E1...
Страница 123: ...Field Replaceable Unit 8 17 E13 E22 E10 E17 E16 E14 E18 E19 E23 E20 E21 E15 E11 E12 E24...
Страница 134: ......
Страница 180: ......
Страница 212: ......
Страница 254: ......
Страница 258: ......
Страница 280: ......
Страница 281: ...P N 046 011984 00 7 0...