A-12 Electrical Safety Inspection
ELECTRICAL SAFETY INSPECTION
7-
Mains on Applied Part Leakage
OVERVIEW
The Mains on Applied Part test applies a test voltage, which is 110% of the mains voltage,
through a limiting resistance, to selected applied part terminals. Current measurements are then
taken between the selected applied part and earth. Measurements are taken with the test voltage
(110% of mains) to applied parts in the normal and reverse polarity conditions as indicated on the
display.
The following outlet conditions apply when performing the Mains on Applied Part test.
Normal Polarity;
Reversed Polarity
TEST PROCEDURE
Prepare
To perform a calibration from the Mains on Applied Part test, press CAL (SOFT KEY 2).
1) Disconnect ALL patient leads, test leads, and DUT outlet connections.
2) Press CAL to begin calibration, as shown:
If the calibration fails, the previously stored readings will be used until a passing calibration has
occurred. Also, the esc/stop key has no effect during calibration.
3) When the calibration is finished, the Mains on Applied Part test will reappear.
Warning
1) A 2-beep-per-second signal indicates high voltage present at the applied part terminals while a
calibration is being performed.
2) High voltage is present at applied part terminals while measurements are being taken.
Содержание DC-68
Страница 2: ......
Страница 12: ......
Страница 18: ......
Страница 30: ......
Страница 45: ...System Installation 3 15...
Страница 54: ......
Страница 72: ......
Страница 90: ......
Страница 108: ...8 2 Field Replaceable Unit 8 1 Explosive View A0 B0 C0 D0 E0 F0 G0...
Страница 121: ...Field Replaceable Unit 8 15 8 2 5 Main Unit Assembly E0 E2 E4 E6 E5 E9 E8 E3 E7 E1...
Страница 123: ...Field Replaceable Unit 8 17 E13 E22 E10 E17 E16 E14 E18 E19 E23 E20 E21 E15 E11 E12 E24...
Страница 134: ......
Страница 180: ......
Страница 212: ......
Страница 254: ......
Страница 258: ......
Страница 280: ......
Страница 281: ...P N 046 011984 00 7 0...