MIV V4+ Mini DC Inverter R410A (220V, 8 kW)
DM12-01.01.05en
60
Installation
Insulate for the jointing area, expanding area and the flange area
Insulate for the jointing area, expanding area and the flange area should be done after checking leakage
of the pipes
Make sure there’s no clearance in the joining part of the accessorial insulation material and local
preparative insulation material.
Enswathe
disposal
After insulation of the pipes, do the enswathe disposal with binding belt, make sure it’s tight.
6.3 Drainage pipe insulation
The connection part should be insulated, or else water will be condensing at the non-insulation part.
Note
6.3.1
The jointing area, expanding area and the flange area should be heat insulated after passing the
pressure test
6.3.2
The gas and liquid pipe should be heat insulated individually, the connecting part should be heat
insulated individually.
6.3.3
Use the attached heat-insulation material to insulate the pipe connections (pipes’ tie-in ,expand nut ) of
the indoor unit.
Содержание MIV V4+ Mini
Страница 1: ...DM12 01 01 05en Service manual MIV V4 Mini DC INVERTER R410A 220V 50Hz 1Ph MVUH80A VA1 ...
Страница 2: ...Contents Part 1 General Information 1 Part 2 Outdoor Units 6 Part 3 Installation 44 ...
Страница 13: ...DM12 01 01 05en MIV V4 Mini DC Inverter R410A 220V 8 kW Outdoor units 11 5 Wiring Diagrams MVUH80A VA1 ...
Страница 14: ...MIV V4 Mini DC Inverter R410A 220V 8 kW DM12 01 01 05en 12 Outdoor units 6 Field Wiring MVUH80A VA1 ...
Страница 23: ...DM12 01 01 05en MIV V4 Mini DC Inverter R410A 220V 8 kW Outdoor units 21 10 Operation Limits ...