RYZ
ENGINE 5-5
Loosen the three engine securing points (2), without removing
the top rear securing nut.
Loosen the two securing points (3) on the chassis strengthe-
ners (4).
Remove the front support securing shaft.
Lower the two chassis strengtheners.
Loosen the two side securing bolts (5) on the front engine su-
pport (without removing the nuts).
Loosen and remove the two front engine support securing bol-
ts (6) on the chassis front box section.
Push the support forwards.
Remove the rear bottom securing shaft.
Unhook the engine from the top rear chassis pins (7) to remove it.
N.B.:
With the engine removed, see Section 5 “ENGINE” for de-
tails of operations to be performed on the engine.
INSTALLATION
Fit the shaft, the washers and the nut (1) on the engine top
rear mounting.
15)
16)
17)
18)
19)
20)
21)
22)
23)
1)
5
Содержание RYZ 50 Cross C
Страница 4: ...RYZ NOTES...
Страница 6: ...RYZ NOTES...
Страница 10: ...RYZ NOTES...
Страница 38: ...RYZ NOTES...
Страница 40: ...RYZ TIGHTENING TORQUE SPECIFICATIONS 5 29 SERVICING MATERIALS REQUIRED 5 29 SPECIAL TOOLS 5 30 5 2 ENGINE 5...
Страница 82: ...RYZ NOTES...
Страница 90: ...RYZ NOTES...
Страница 91: ......