RYZ
ENGINE 5-27
Fit the rotor (3) onto the crankshaft connecting rod, ensuring
that it is seated on the key.
Immobilise the rotor with a front pivot adjustable spanner (1).
Fit and tighten the rotor nut.
Nut tightness torque:
5.2 daN•m (52 N•m)
Fit the gasket and the magneto cover.
Bolts tightness torque:
0,4 daN·m (4 N·m)
VARIOUS OPERATIONS
REMOVING THE WATER PUMP
Remove the eight clutch cover securing bolts.
Remove the clutch cover.
Remove the eight water pump cover securing bolts (1).
Remove the cover.
Remove the two centring pivots and the paper gasket. (2).
On the inside of the clutch cover, remove:
a) the rubber ring (3).
b) the washer (4).
c) the 30 tooth nylon gear (5).
d) the driving cotter pin (6).
e) the washer (7).
f) the turbine with its shaft (8).
g) the seal (9).
Check the condition of the turbine shaft. If there is evidence of
wear, renew the turbine.
FITTING THE WATER PUMP
Fit a new lightly greased seal (9), using the special tool.
Special tool (L)
Proceed in the reverse order to dismantling.
3)
4)
5)
6)
1)
2)
3)
4)
5)
6)
7)
1)
2)
5
CAUTION:
The rubber ring and the paper gasket must be renewed
every time the unit is dismantled.
Содержание RYZ 50 Cross C
Страница 4: ...RYZ NOTES...
Страница 6: ...RYZ NOTES...
Страница 10: ...RYZ NOTES...
Страница 38: ...RYZ NOTES...
Страница 40: ...RYZ TIGHTENING TORQUE SPECIFICATIONS 5 29 SERVICING MATERIALS REQUIRED 5 29 SPECIAL TOOLS 5 30 5 2 ENGINE 5...
Страница 82: ...RYZ NOTES...
Страница 90: ...RYZ NOTES...
Страница 91: ......