5-2 | Model 920 Multi-Gas Analyzer
Under normal operating conditions, lethal concentrations of H2S and
other toxic gases from the sample stream may be present within the
sample system. The sample system is defined as all components in the
analyzer system through which sample gas passes.
Before working on the sample system, manually Zero the analyzer,
isolate it (block it in) from the sample stream, and disconnect the
power. Follow this procedure prior to changing out any analyzer com-
ponents or replacing any parts (as part of regular preventive mainte-
nance), or when performing leak checks following the replacement of
instrument air or other adjustments to any of the connection points
in the analyzer’s sample system.
If this is not possible, a breathing
apparatus must be worn while servicing the sample system.
If handling the circuit boards, do not subject them to static discharge.
The ideal solution is a static-safe work area. Since such areas typically
are not available at analyzer installation sites, the use of a wrist strap
connected directly to a ground is recommended. If a wrist strap is
not available, you should at the very least touch the metal chassis to
ground yourself before handling the boards.
Preventive Maintenance
The “Analyzer Preventive Maintenance Schedule” lists general mainte-
nance to follow, to ensure continued and proper operation of the analyzer.
Preventing leaks in the sample system is critical to proper analyzer
operation. If sample gas migrates into the Reflector Block or Optical
Bench (uncommon) due to a leak in the Measuring Cell, the optics
will become damaged and most likely require replacement. Most
leaks are preventable with regular cleaning and replacement of the
Measuring Cell o-rings.
Leak check the analyzer’s sample system whenever it has been dis-
mantled for maintenance.
!
CAUTION
!
WARNING
!
CAUTION
Содержание 920
Страница 39: ...Specifications 2 11 ...
Страница 40: ...2 12 Model 920 Multi Gas Analyzer ...
Страница 41: ...Specifications 2 13 2019 02 05 ...
Страница 42: ...2 14 Model 920 Multi Gas Analyzer ...
Страница 43: ...Specifications 2 15 ...
Страница 44: ...2 16 Model 920 Multi Gas Analyzer ...
Страница 45: ...Specifications 2 17 ...
Страница 47: ...Specifications 2 19 Heater Plate ATEX and IECEx Certificates and Marking ...
Страница 48: ...2 20 Model 920 Multi Gas Analyzer ...
Страница 49: ...Specifications 2 21 ...
Страница 50: ...2 22 Model 920 Multi Gas Analyzer ...
Страница 51: ...Specifications 2 23 ...
Страница 52: ...2 24 Model 920 Multi Gas Analyzer ...
Страница 53: ...Specifications 2 25 ATEX and IECEx certified Model 920 Analyzers are marked with this label ...
Страница 54: ...2 26 Model 920 Multi Gas Analyzer Disconnect Enclosure Type 200 ATEX and IECEx Certificates and Marking ...
Страница 55: ...Specifications 2 27 ...
Страница 56: ...2 28 Model 920 Multi Gas Analyzer ...
Страница 57: ...Specifications 2 29 ...
Страница 58: ...2 30 Model 920 Multi Gas Analyzer ...
Страница 59: ...Specifications 2 31 ...
Страница 60: ...2 32 Model 920 Multi Gas Analyzer ATEX and IECEx certified Model 920 Analyzers are marked with this label ...
Страница 71: ...Installation and Start Up 3 11 Figure 3 4 Optical Bench Measuring Cell assembly ...
Страница 99: ...Installation and Start Up 3 39 Figure 3 11 Over Temp alarm reset switch SW300 Termination board ...
Страница 108: ...3 48 Model 920 Multi Gas Analyzer This page intentionally left blank ...
Страница 173: ...Controller User Interface 4 65 Figure 4 8 Customer signal connections ...
Страница 187: ...Maintenance and Troubleshooting 5 11 Figure 5 1 Measuring Cell assembly ...
Страница 211: ...Maintenance and Troubleshooting 5 35 Figure 5 5 Optical Bench Chopper Assembly Maintenance Diagram ...
Страница 226: ...5 50 Model 920 Multi Gas Analyzer Figure 5 8 Flameproof Heater Seal Assembly layout WX 14324 1A ...
Страница 227: ...Maintenance and Troubleshooting 5 51 Figure 5 9 Flameproof Heater Seal internal component layout 100 1622 1A ...
Страница 228: ...5 52 Model 920 Multi Gas Analyzer Figure 5 10 Oven Heater and Temperature Sensor wiring WX 14161 ...
Страница 243: ...Maintenance and Troubleshooting 5 67 Figure 5 13 Over temp alarm reset switch SW300 Termination board ...
Страница 262: ...A 2 Model 920 Multi Gas Analyzer Ribbon Cable Interconnect WX 102836 ...
Страница 263: ...Appendix A Drawings A 3 GP Lower Enclosure to Electronics Wiring CE Analyzers WX 102810 ...
Страница 264: ...A 4 Model 920 Multi Gas Analyzer Heater and Sensor Wiring GP Div 2 Analyzers WX 102851 ...
Страница 265: ...Appendix A Drawings A 5 Heater and Sensor Wiring CE Zone 1 Analyzers WX 102852 ...
Страница 266: ...A 6 Model 920 Multi Gas Analyzer Lower Cabinet Wiring CE GP Analyzers 120V 100 1341 3 ...
Страница 267: ...Appendix A Drawings A 7 Lower Cabinet Wiring CE GP Analyzers 240V 100 1342 3 ...
Страница 268: ...A 8 Model 920 Multi Gas Analyzer Signal Wiring PD GP Div 2 CE Zone 1 Analyzers WX 102815 ...
Страница 270: ...A 10 Model 920 Multi Gas Analyzer 15V and 5V Power Supply DC Wiring GP Div 2 CE Zone 1 Analyzers WX 102811 ...
Страница 271: ...Appendix A Drawings A 11 24V Power Supply DC Wiring CE Zone 1 Analyzers WX 102812 ...
Страница 272: ...A 12 Model 920 Multi Gas Analyzer RS 232 Communications Cable Wiring 300 9480 ...
Страница 273: ...Appendix A Drawings A 13 RS 232 RS 485 Module Wiring CE Zone 1 GP Div 2 Analyzers 100 2185 ...
Страница 274: ...A 14 Model 920 Multi Gas Analyzer Microcontroller Board 100 0117 ...
Страница 275: ...Appendix A Drawings A 15 Host Controller Board Display Interface 100 0138 ...
Страница 276: ...A 16 Model 920 Multi Gas Analyzer Model 9xx Series Analyzer Type 200 Disconnect Enclosure Details ...
Страница 278: ...S 2 Model 920 Multi Gas Analyzer This page intentionally left blank ...